Laserfiche WebLink
BACKGROUND <br /> On June 2, 2015, Council awarded the contract to the lowest responsible bidder, O'Grady <br /> Paving, Inc. in the amount of$2,514,901.70 <br /> The first component of the project consisted of approximately 1,121,000 square feet of <br /> pavement resurfacing on the following streets: <br /> TREATMENT(* <br /> STREET NAME BEGIN LOCATION END LOCATION ) <br /> UTAH ST WYOMING ST BERNAL AVE SAMI <br /> WYOMING ST WASHINGTON ST NEVADA ST SAMI <br /> CALIFORNIA AVE STANLEY BLVD NEVADA ST SAMI <br /> BERNAL AVE NEVADA ST STANLEY BLVD SAMI <br /> WASHINGTON ST CALIFORNIA ST E/O WYOMING SAMI <br /> NEVADA ST BERNAL AVE CALIFORNIA AVE SAMI <br /> LINDA WAY ANGELA ST NEAL ST SAMI <br /> SUTTER GATE AVE MOHR AVE END SAMI <br /> JONES GATE CT SUTTER GATE AVE END SAMI <br /> HARTLEY GATE CT LIN GATE ST END SAMI <br /> LIN GATE CT LIN GATE ST END SAMI <br /> LIN GATE ST SUTTERGATE AVE END SAMI <br /> LARAMIE GATE CIR SUTTERGATE AVE(SOUTH) SUTTER GATE AVE(NORTH) SAMI <br /> LARAMIE GATE CT LARAMIE GATE CIR END SAMI <br /> SMITH GATE CT MOHR AVE END SAMI <br /> KNOX GATE CT MOHR AVE END SAMI <br /> FUNSTON GATE CT MOHR AVE END SAMI <br /> ROSS GATE CT MOHR AVE END SAMI <br /> ROSS GATE WAY MOHR AVE SUTTER GATE AVE SAMI <br /> TANAGER CT SHEARWATER RD END OUF <br /> TANAGER DR SUTTER GATE AVE MOHR AVE OUF <br /> TANAGER DR MOHR AVE SHEARWATER RD OUF <br /> TAHOE CT TANAGER DR END OUF <br /> WOODTHRUSH CT MOHR AVE END OUF <br /> INYO CT MOHR AVE END OUF <br /> KLAMATH CT MOHR AVE END OUF <br /> SHASTA CT TANAGER DR END OUF <br /> SHEARWATER CT TANAGER DR END OUF <br /> SHEARWATER RD GREENWOOD RD TANAGER DR OUF <br /> SEA EAGLE CT SHEARWATER RD END OUF <br /> EL DORADO CT TANAGER DR END OUF <br /> MOHR AVE WOODTHRUSH AVE SANTA RITA RD OUF <br /> MOHR AVE SUTTER GATE ST. MCHENRRY GATE WAY OL <br /> GREENWOOD RD VALLEY AVE BLACK AVE OUF <br /> SECRETARIAT DR HOPYARD RD END OUF <br /> DUDLEY CT HOPYARD RD FRONTAGE END SAMI <br /> Page 2 of 6 <br />