My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
050316
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:23:26 PM
Creation date
4/29/2016 10:33:30 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/3/2016
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
forfeited if the trees are destroyed or substantially damaged. No trees shall be <br /> removed other than those specifically designated for removal on the approved <br /> plans or tree report. <br /> 61. The final landscape plan shall show the removal or replacement of the proposed <br /> Agapanthus africanus plants. <br /> Livermore-Pleasanton Fire Department <br /> 62. All buildings covered by this approval shall be equipped with an automatic fire <br /> sprinkler system. Plans and specifications for the automatic fire sprinkler system <br /> shall be submitted for review and approval by the Livermore-Pleasanton Fire <br /> Department prior to installation. The fire alarm system, including water flow and <br /> valve tamper, shall have shop drawings submitted for review and approval by the <br /> Livermore-Pleasanton Fire Department prior to installation. All required <br /> inspections and witnessing of tests shall be completed prior to final inspection and <br /> occupancy of the building(s). <br /> 63. The location(s) of the fire hydrant(s) and the detail of the turn-around areas for fire <br /> trucks shall be reviewed and approved by the Livermore-Pleasanton Fire <br /> Department prior to issuance of a building permit. <br /> STANDARD CONDITIONS <br /> Community Development Department <br /> 64. The project applicant shall submit a refundable cash bond for hazard and erosion <br /> control. The amount of this bond will be determined by the Director of Community <br /> Development. The cash bond will be retained by the City until all the permanent <br /> landscaping is installed for the development, including individual lots, unless <br /> otherwise approved by the department. <br /> 65. If any prehistoric or historic artifacts, or other indication of cultural resources are <br /> found once the project construction is underway, all work must stop within 20 <br /> meters (66 feet) of the find. A qualified archaeologist shall be consulted for an <br /> immediate evaluation of the find prior to resuming groundbreaking construction <br /> activities within 20 meters of the find. If the find is determined to be an important <br /> archaeological resource, the resource shall be either avoided, if feasible, or <br /> recovered consistent with the requirements of the State CEQA Guidelines. In the <br /> event of discovery or recognition of any human remains in any on-site location, <br /> there shall be no further excavation or disturbance of the site or any nearby area <br /> reasonably suspected to overlie adjacent remains until the County coroner has <br /> determined, in accordance with any law concerning investigation of the <br /> circumstances, the manner and cause of death and has made recommendations <br /> concerning treatment and dispositions of the human remains to the person <br /> responsible for the excavation, or to his/her authorized representative. A similar <br /> note shall appear on the improvement plans. <br /> 11 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.