Laserfiche WebLink
construction traffic noise will not affect nearby residents. Prior to construction, the <br /> hours of construction shall be posted on site. <br /> d. All construction equipment must meet DMV and City noise standards and shall be <br /> equipped with muffling devices. <br /> e. Designate a noise disturbance coordinator who will be responsible for responding to <br /> complaints about noise during construction. The telephone number of the noise <br /> disturbance coordinator shall be conspicuously posted at the construction site and <br /> shall be provided to the City of Pleasanton. Copies of the construction schedule <br /> shall also be posted at nearby noise sensitive areas. <br /> f. Construction activities conducted on the subject property shall not exceed 86 dBA at <br /> any point outside of the property plane of the subject property (Pleasanton Municipal <br /> Code Section 9.04.100.B.). <br /> These requirements shall be printed on the construction plans to the satisfaction of the <br /> Director of Community Development. <br /> 26. Rain gutters shall discharge into landscaping planter areas where feasible. These details <br /> shall be shown on the plans submitted to the Building and Safety Division for plan check <br /> and are subject to the review and approval of the Director of Community Development <br /> prior to building permit issuance. <br /> 27. The project shall comply with the State of California Model Water Efficient Landscape <br /> Ordinance and Bay Friendly Basics Landscape Checklist. Prior to issuance of a Building <br /> Permit, the applicant shall submit the following documentation to the Planning Division: <br /> a. Landscape Documentation Package, which includes date; project applicant/contact <br /> information; project address; total landscape area; project type (new, rehabilitated, <br /> public, private, cemetery, homeowner-installed); water supply type (potable, <br /> recycled, well, greywater, combination of potable/greywater); and applicant <br /> signature/date with the statement that "I agree to comply with the requirements of <br /> the prescriptive compliance option of the Water Efficient Landscape Ordinance." <br /> b. Landscape Plan documenting: incorporation of compost at a rate of at least 4 cubic <br /> yards/1,000 square feet; compliance with the plant material criteria; compliance with <br /> the turf criteria; compliance with the irrigation system criteria; and installation of <br /> private sub-meters if the project is non-residential with a landscape area of <br /> 1,000 square feet or greater <br /> 28. The new homes shall be constructed to allow for future installation of a Photovoltaic (PV) <br /> system and solar water heating systems. The project applicant/developer shall comply <br /> with the following requirements for making the proposed residential units photovoltaic- <br /> ready and solar-water-heating-ready: <br /> Case No. PUD-115, 11249 Dublin Canyon Planning Commission <br /> Page 5 of 24 <br />