Laserfiche WebLink
c. The project developer shall submit sizing design criteria to treat stormwater <br /> runoff and for hydromodification, if required, at the time of PUD plan submittal <br /> and an updated detailed copy of calculations with subsequent submittals. <br /> d. Landscaping shall be designed to minimize irrigation and runoff, promote surface <br /> infiltration where appropriate and acceptable to the project soils engineer, and <br /> minimize the use of fertilizers and pesticides that can contribute to stormwater <br /> pollution. <br /> I. Structures shall be designed to prohibit the occurrence and entry of pests into <br /> buildings, thus minimizing the need for pesticides. <br /> II. Where feasible, landscaping shall be designed and operated to treat <br /> stormwater runoff. In areas that provide detention of water, plants that are <br /> tolerant of saturated soil conditions and prolonged exposure to water shall be <br /> specified. Soil shall be amended as required. (See planting guide line by <br /> Alameda County Clean Water Program.) <br /> III. Plant materials selected shall be appropriate to site specific characteristics <br /> such as soil type, topography, climate, amount and timing of sunlight, <br /> prevailing winds, rainfall, air movement, patterns of land use, ecological <br /> consistency and plant interactions to ensure successful establishment. <br /> IV. Landscaping shall also comply with City of Pleasanton ordinances and <br /> policies regarding water conservation. <br /> e. Roof drains shall discharge and drain away from the building foundation. Ten <br /> percent of the stormwater flow shall drain to landscaped area or to an unpaved <br /> area wherever practicable. <br /> B. Construction Requirements <br /> The Construction General Permit's construction requirements include, but are not <br /> limited to, the following: <br /> Construction activities (including other land-disturbing activities) that disturb one acre or <br /> more (including smaller sites that are part of a larger common plan of development) are <br /> regulated under the NPDES stormwater program. Operators of regulated construction <br /> sites are required to develop and implement a Stormwater Pollution Prevention Plan <br /> and to obtain a Construction General Permit (NOI) from the State Water Resources <br /> Control Board to discharge stormwater: <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/docs/finalconstpermi <br /> t.pdf <br /> Stormwater <br /> 1. The project developer shall submit a Stormwater Pollution Prevention Plan (SWPPP) <br /> for review by the City Engineer/Chief Building Official prior to issuance of building or <br /> engineering permits. A reviewed copy of the SWPPP shall be available at the project <br /> site until engineering and building permits have been signed off by the inspection <br /> departments and all work is complete. A site specific SWPPP must be combined <br /> with proper and timely installation of the BMPs, thorough and frequent inspections, <br /> Case No. PUD-115, 11249 Dublin Canyon Planning Commission <br /> Page 21 of 24 <br />