My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
050316
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 10:44:52 AM
Creation date
4/29/2016 10:31:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/3/2016
DESTRUCT DATE
15Y
DOCUMENT NO
03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
steel poles with poured in place bases, on the LS-1 C schedule per City requirements and <br /> PG&E standard details, unless otherwise specifically approved. The lighting system <br /> design shall conform to the Illuminating Engineering Society (IES). Approval for the <br /> number, location, and type of electroliers shall be subject to the review and approval of <br /> the City Engineer. <br /> 95. The project developer shall submit detailed landscape and irrigation plans as part of the <br /> improvement plans. The irrigation plan shall provide for automatic controls. <br /> 96. All retaining walls along the street shall be placed behind the Public Service Easement <br /> (PSE), unless otherwise approved by the City Engineer. <br /> 97. A detailed grading and drainage plan prepared by a licensed Civil Engineer including all <br /> supporting information and design criteria (including but not limited to any peer review <br /> comments), storm drain treatment calculations, hydromodification worksheets, etc., shall <br /> be submitted as part of the improvement plans. <br /> 98. The minimum grade for the gutter flowline shall be set at one percent where practical, but <br /> not less than 0.75% unless otherwise approved by the City Engineer. <br /> 99. A water meter shall be provided to each lot of record within the development unless <br /> otherwise approved by the City Engineer. <br /> 100. A sanitary sewer lateral with two-way cleanout (located at the back of the sidewalk or <br /> curb, whichever is applicable) shall be provided to each lot of record within the <br /> development unless otherwise approved by the City Engineer. <br /> 101. The park dedication fees shall be paid to the City prior to approval of the map, at the rate <br /> then in effect, for the total number of buildable lots on the map, unless this requirement <br /> has been otherwise satisfied. <br /> 102. For residential subdivisions or properties in residential zones, any existing assessment to <br /> which the property may be subject shall be cleared prior to the approval of the parcel <br /> map. <br /> 103. The improvement plans for this development shall contain signage and striping plans that <br /> are subject to the approval of the City Traffic Engineer. <br /> 104. The curb and gutter along the street shall have a subdrain installed at either the back of <br /> the curb or lip of gutter at the discretion of the City Engineer. This detail shall be shown <br /> on the improvement plans. Said drains shall be connected to the storm drain system or <br /> drained by other means acceptable to the City Engineer. <br /> 105. The property owner/developer shall deposit a bond with the City to ensure completion of <br /> any required improvements. This bond shall be in a standard form approved by the City <br /> Attorney and shall be in an amount satisfactory to the City Engineer. The City Engineer <br /> Case No. PUD-115, 11249 Dublin Canyon Planning Commission <br /> Page 16 of 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.