Laserfiche WebLink
94. The project developer shall submit detailed landscape and irrigation plans as part of the <br />improvement plans. The irrigation plan shall provide for automatic controls. <br />95. All retaining walls along the street shall be placed behind the Public Service Easement <br />(PSE), unless otherwise approved by the City Engineer. <br />96. A detailed grading and drainage plan prepared by a licensed Civil Engineer including all <br />supporting information and design criteria (including but not limited to any peer review <br />comments), storm drain treatment calculations, hydromodification worksheets, etc., shall <br />be submitted as part of the improvement plans. <br />97. The minimum grade for the gutter flowline shall be set at one percent where practical, but <br />not less than 0.75% unless otherwise approved by the City Engineer. <br />98. A water meter shall be provided to each lot of record within the development unless <br />otherwise approved by the City Engineer. <br />99. A sanitary sewer lateral with two -way cleanout (located at the back of the sidewalk or <br />curb, whichever is applicable) shall be provided to each lot of record within the <br />development unless otherwise approved by the City Engineer. <br />100. The park dedication fees shall be paid to the City prior to approval of the map, at the rate <br />then in effect, for the total number of buildable lots on the map, unless this requirement <br />has been otherwise satisfied. <br />101. For residential subdivisions or properties in residential zones, any existing assessment to <br />which the property may be subject shall be cleared prior to the approval of the parcel <br />map. <br />102. The improvement plans for this development shall contain signage and striping plans that <br />are subject to the approval of the City Traffic Engineer. <br />103. The curb and gutter along the street shall have a subdrain installed at either the back of <br />the curb or lip of gutter at the discretion of the City Engineer. This detail shall be shown <br />on the improvement plans. Said drains shall be connected to the storm drain system or <br />drained by other means acceptable to the City Engineer. <br />104. The property owner /developer shall deposit a bond with the City to ensure completion of <br />any required improvements. This bond shall be in a standard form approved by the City <br />Attorney and shall be in an amount satisfactory to the City Engineer. The City Engineer <br />may waive this requirement if the required improvements have been satisfactorily <br />installed prior to approval of the map. <br />105. All overhead utilities serving the existing home and the proposed houses shall be installed <br />underground in conduit to the nearest riser pole acceptable to the Utility Companies and <br />City Engineer. All utility boxes and transformers for this project shall be installed <br />underground. All capacitor banks or switches for the project may be installed above <br />ground if properly screened to the satisfaction of the Director of Community Development. <br />