Laserfiche WebLink
8. The applicant/project developer acknowledges that the City of Pleasanton does not <br />guarantee the availability of sufficient sewer capacity to serve this development by the <br />approval of this case, and that the project developer agrees and acknowledges that <br />building permit approval may be withheld if sewer capacity is found by the City not to be <br />available. <br />9. This approval does not guarantee the availability of sufficient water capacity to serve the <br />project. Prior to the recordation of a Final Parcel Map, issuance of a grading permit, <br />issuance of a building permit, or utility extension approval to the site, whichever is <br />sooner, the applicant/developer shall submit written verification from Zone 7 Water <br />Agency or the City of Pleasanton's Utility Planning Division that water is available for the <br />project. To receive the verification, the applicant/developer may need to offset the <br />project's water demand. <br />10. The project shall meet all requirements of the City's Growth Management Ordinance, as <br />described in a Growth Management Agreement <br />11. The proposed PUD shall follow the development standards listed below: <br />a. All setbacks shall not include any portion of the private street. They are measured behind the curb of <br />the private street. <br />b. Any garage area exceeding 600 square feet shall be included in the FAR or maximum building area <br />calculations. <br />C. No development including grading and landscaping shall be allowed above elevation 440 feet for Lot <br />2 and elevation 443 feet for Lot 3. <br />d. The maximum building height shall be measured from the lowest finished grade adjacent to the <br />building to the highest point of the building excluding chimneys. <br />e. Unless otherwise specified in the conditions of approval, all site development standards shall be <br />those of the R -1- 20,000 District. <br />Lot 1 <br />Lot 2 <br />Lot 3 <br />Setbacks (min.) <br />Front: <br />15 feet (porch) <br />15 feet (porch) <br />15 feet (porch) <br />20 feet (house) <br />20 feet (house) <br />20 feet (house) <br />25 feet (garage) <br />25 feet (garage) <br />25 feet (garage) <br />Side <br />street side: <br />20 feet <br />10 feet <br />10 feet <br />interior side): <br />10 feet <br />10 feet <br />10 feet <br />Rear: <br />20 feet <br />development limit <br />development limit <br />line <br />line <br />FAR (max.) <br />25% <br />NA <br />25% <br />Floor Area <br />5,273 sq.ft. <br />6,000 sq. ft. <br />5,670 sq.ft. <br />max. <br />Height (max.) <br />30 feet <br />30 feet <br />34 feet <br />a. All setbacks shall not include any portion of the private street. They are measured behind the curb of <br />the private street. <br />b. Any garage area exceeding 600 square feet shall be included in the FAR or maximum building area <br />calculations. <br />C. No development including grading and landscaping shall be allowed above elevation 440 feet for Lot <br />2 and elevation 443 feet for Lot 3. <br />d. The maximum building height shall be measured from the lowest finished grade adjacent to the <br />building to the highest point of the building excluding chimneys. <br />e. Unless otherwise specified in the conditions of approval, all site development standards shall be <br />those of the R -1- 20,000 District. <br />