My WebLink
|
Help
|
About
|
Sign Out
RES 16835
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:04:53 AM
Creation date
3/3/2016 1:05:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/1/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16835
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No.16-835 <br /> Exhibit A <br /> existing tree drip lines, as shown on the plans. The fencing shall remain in place <br /> until final landscape inspection by the Community Development Department. <br /> Removal of.such fencing prior to that time may result in a "stop work order." <br /> Building and Safety Division <br /> 74. All retaining walls higher than four feet from the top of the wall to the bottom of <br /> the footway shall be constructed of reinforced concrete, masonry, or other <br /> material as approved by the Director of Community Development, or shall be an <br /> approved crib wall type. Calculations signed by a registered civil engineer shall <br /> accompany the wall plans. <br /> 75. At the time of building permit plan submittal, the project applicant or developer <br /> shall submit a final grading and drainage plan prepared by a licensed civil <br /> engineer depicting all final grades and on-site drainage control measures to <br /> prevent stormwater runoff onto adjoining properties. <br /> 76. Prior to issuance of building or demolition permits, the applicant shall submit a <br /> waste management plan to the Building and Safety Division. The plan shall <br /> include the estimated composition and quantities of waste to be generated and <br /> identify how the project applicant or developer intends to recycle at least <br /> 75 percent of the total job site construction and demolition waste measured by <br /> weight or volume. Proof of compliance shall be provided to the Chief Building <br /> and Safety Official prior to the issuance of a final building permit. During <br /> demolition and construction, the project applicant or developer shall mark all <br /> trash disposal bins "trash materials only" and all recycling bins "recycling <br /> materials only." The project applicant or developer shall contact Pleasanton <br /> Garbage Service for the disposal of all waste from the site. <br /> 77. Unless otherwise required and/or permitted, the project developer shall submit <br /> two copies of the site soils report to the Chief Building Official for third party peer <br /> review and shall pay for such review at the time specified by the Building Official, <br /> but in all cases before the issuance of a grading permit. <br /> 78. The project developer shall submit record tract grading plans showing: <br /> a. The elevation of all four corners of each lot as well as the center of the lot. <br /> b. All top and toe of slope elevations. <br /> c. Top and toe of all retaining wall elevations. <br /> 79. The record-grading plan for each lot is to be submitted to the Chief Building <br /> Official before the first house final. <br /> 80. The soils engineer shall certify the pad compactions of all lots containing fill to <br /> the satisfaction of the Chief Building Official prior to the issuance of building <br /> permits. <br /> Page 16 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.