My WebLink
|
Help
|
About
|
Sign Out
RES 16819
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:03:05 AM
Creation date
2/3/2016 1:27:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16819
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> Registered Environmental Assessor or a registered Assessor or a Division inspection during construction. <br /> engineer to confirm the absence or presence of registered engineer demolition to verify Date: <br /> asbestos-containing materials and lead-based paint in to conduct appropriate <br /> structures to be demolished.This survey shall be appropriate handling of <br /> completed prior to any demolition activities associated survey(s)that hazardous <br /> with the project. Adequate abatement practices,such as confirm the materials. <br /> containment and/or removal for all asbestos-containing absence or <br /> materials and lead-based paint,shall be implemented in presence of <br /> accordance with applicable laws prior to demolition. Any asbestos-containing <br /> PCB-containing equipment,fluorescent light tubes containing materials,lead- <br /> mercury vapors,and fluorescent light ballasts containing based paint, PCBs, <br /> DEHP shall also be removed and legally disposed of. and DEHP. <br /> Mitigation Measure 4.12-4a: During periods of high fire The project Community Review the Fire Prior to issuance Verified by: <br /> danger or during red flag conditions,operation of applicant shall Development Prevention Plan for of grading or <br /> equipment with small motors for vegetation/landscape implement the Department; the project;conduct building permit, <br /> maintenance shall be prohibited. All mechanical measures as Planning Division field inspection whichever is <br /> equipment shall have approved spark arrestors and specified and shall during construction. sooner; inspect <br /> comply with California Public Resources Code(PRC) prepare a Fire during Date: <br /> Sections 4431,4435,4442 and 4437 to limit potential Prevention Plan construction. <br /> for ignition of incidental fires. <br /> Mitigation Measure 4.12-4b: Comply with the <br /> WUIP,which requires that vegetation be managed, <br /> that hydrants be operational,and that an approved <br /> Fire Prevention Plan be completed prior to <br /> construction.The Fire Prevention Plan requires on- <br /> site fire suppression resources to include shovel, <br /> water pump,fire extinguisher,and two-way radio or <br /> communications for fire reporting. <br /> Mitigation Measure 4.12-5a: During periods of high The project Community Verify completion of Prior to issuance Verified by: <br /> fire danger or during red flag conditions,operation of applicant shall Development Fire Safety of grading or <br /> equipment with small motors for vegetatioMandscape implement the Department; Awareness building permit, <br /> maintenance shall be prohibited. All mechanical measures as Planning Division Program and WUIP whichever is <br /> equipment shall have approved spark arrestors and specified,including and compliance sooner; inspect <br /> comply with California Public Resources Code(PRC) the preparation of a with the provisions during Date: <br /> Sections 4431,4435,4442 and 4437 to limit potential Fire Safety of these plans; construction <br /> for ignition of incidental fires. Awareness conduct field <br /> Program. inspection during <br /> Mitigation Measure 4.12-5b:The project sponsor shall construction and <br /> prepare a Fire Safety Awareness Program to address regular inspections <br /> fire safe behaviors and fuel management.The project after project <br /> would include the disclosure of the Program's completion. <br /> requirements as part of the CC&Rs for the project <br /> development.Alternatively, in consultation with the City, <br /> the proposed project could include the formation of an <br /> LurD RANCH II-PUD-25 19 JANUARY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.