Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures' Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> occupied habitat.These measures may be necessary <br /> to ensure that owls are not harmed or injured during <br /> construction,and that the loss of occupied habitat is <br /> mitigated. Mitigation for the loss of occupied habitat <br /> could be accomplished on or off the property,subject <br /> to approval of a mitigation land management plan by <br /> CDFG. <br /> Mitigation Measure 4.3-5: The proposed project would Project applicant Community Review and approve Prior to issuance Verified by: <br /> impact approximately 0.022 acre of Waters of the United shall hire a qualified Development a qualified wetlands of grading or <br /> States(0.016 acre and 243 lineal feet of drainage wetlands biologist Department; biologist and building permit, <br /> channel waters, and 0.006 acre of in-channel wetlands). approved by the City Planning Division wetland restoration whichever is <br /> The connection to Sunset Creek Lane would require of Pleasanton who plan sooner. <br /> approximately 100 linear feet(400 square feet)of will prepare a plan Date: <br /> additional impact. While compensation for impacts to for creation of Verify inclusion of all Review monitoring <br /> Waters of the United States shall occur at a minimum of appropriate permit-required reports for wetland <br /> a 1:1 replacement ratio,the CDFW and RWQCB replacement measures in restoration sites <br /> generally require a replacement ratio of 2:1 or better. To wetlands that applicable for a minimum of <br /> the degree possible,the applicant shall replace lost adheres to all construction plans five years and <br /> wetland resources in kind. Thus,the project would specifications in this and specifications. verify that required <br /> create channel and seasonal drainage at least at a 1:1 measure and will monitoring reports <br /> ratio,including a 1:1 ratio of seasonal wetlands on the verify in writing that Inspect site during have been <br /> Lund Ranch property based on the final calculation of the plan adheres to construction to submitted to <br /> impact. Creation of new channels can be logistically all guidance that is ensure compliance Responsible <br /> difficult as there are finite areas within a site to applicable to the with project Agencies. <br /> accomplish this type of mitigation. Therefore,some project,including construction plans. <br /> mitigation for the seasonal channel may have to be out- conditions imposed <br /> of-kind.This could be accomplished by creating as part of all <br /> additional seasonal wetlands. Responsible Agency <br /> The site supports sufficient opportunities to permits needed for <br /> accommodate creation of wetland habitat. Even if the this work. <br /> project could not create 1:1 ratio of channel,there are a <br /> number of areas along Drainage Areas A and B and <br /> within the non-jurisdictional drainage swales on the site <br /> that could easily accommodate this type of creation <br /> mitigation. <br /> The goal of this mitigation should be to create new <br /> wetlands and enhance existing wetlands in a way that <br /> replaces the functions and values of the wetlands that <br /> are proposed to be filled. A qualified biologist should <br /> develop a restoration plan that identifies the full extent of <br /> the impact,location of suitable sites to create or enhance <br /> wetlands of the necessary acreage,and develop success <br /> criteria specific to the actual wetland creation design. <br /> The mitigation site should be monitored for at least five <br /> years.A detailed wetland restoration plan should be <br /> LUND RANCH II-PUD-25 7 JANUARY 2016 <br />