My WebLink
|
Help
|
About
|
Sign Out
RES 16819
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:03:05 AM
Creation date
2/3/2016 1:27:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16819
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring.and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> In order to optimize tree preservation on-site,the <br /> following measures formulated by HortScience shall be <br /> implemented to protect trees that are proposed to be <br /> retained: <br /> Design Recommendations <br /> 1.Verity the location and tag numbers of all trees within <br /> 25 feet of the proposed construction areas. <br /> 2.Allow the Consulting Arborist to review all future <br /> project submittals including grading, utility,drainage, <br /> irrigation,and landscape plans. <br /> 3.Prepare a site work plan which identifies access and • <br /> haul routes,construction trailer and storage areas,etc. <br /> 4.Establish a Tree Protection Zone around each tree to <br /> be preserved. For design purposes,the Tree <br /> Protection Zone shall be the edge of grading. No <br /> grading,excavation, construction or storage of <br /> materials shall occur within that Zone. <br /> 5.Install protection around all trees to be preserved,to <br /> be located three feet outside the limit of grading. No <br /> entry is permitted into a Tree Protection Zone without <br /> permission of the project superintendent. <br /> 6.Route underground services including utilities,sub- <br /> drains,water or sewer around the Tree Protection <br /> Zone.Where encroachment cannot be voided,special <br /> construction techniques such as hand digging or <br /> tunneling under roots shall be employed where <br /> necessary to minimize root injury. <br /> 7.Use only herbicides safe for use around trees and <br /> labeled for that use,even below pavement. <br /> 8.Design irrigation systems so that no trenching shall <br /> occur within the Tree Protection Zone. <br /> Pre-Construction and Demolition Treatments and <br /> Recommendations <br /> 1.The demolition contractor shall meet with the <br /> Consulting Arborist before beginning work to discuss <br /> work procedures and tree protection. • <br /> 2.Trees to be removed shall be felled so as to fall away <br /> from Tree Protection Zone and avoid pulling and <br /> breaking of roots of trees to remain. If roots are <br /> entwined,the consultant may require first severing the <br /> major woody root mass before extracting the trees,or <br /> grinding the stump below ground. <br /> LUND RANCH II-PUD-25 2 JANUARY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.