Laserfiche WebLink
63. The approved building materials and colors shall be stated on the plans submitted for <br />issuance of building permits. <br />64. All demolition and construction activities, inspections, plan checking, material delivery, <br />staff assignment or coordination, etc., shall be limited to the hours of 8:00 a.m. to 5:00 <br />p.m., Monday through Friday. No construction shall be allowed on State or Federal <br />Holidays or Sundays. The Director of Community Development may allow earlier "start- <br />times" or later "stop- times" for specific construction activities (e.g., concrete pouring), if it <br />can be demonstrated to the satisfaction of the Director of Community Development that <br />the construction noise and construction traffic noise will not affect nearby residents or <br />businesses. All construction equipment must meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. Prior to <br />construction, the applicant shall post on the site the allowable hours of construction <br />activity. <br />65. All excess soil from the site shall be off - hauled from the site and disposed of in a lawful <br />manner. No temporary stockpiling of dirt on this site shall occur without specific review <br />and approval by the Planning Division. <br />66. Campers, trailers, motor homes, or any other similar vehicle are not allowed on the <br />construction site except when needed as sleeping quarters for a security guard. <br />67. A construction trailer shall be allowed to be placed on the project site for daily <br />administration /coordination purposes during the construction period. <br />68. Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br />Landscaping <br />69. The applicant shall enter into an agreement with the City, approved by the City Attorney, <br />which guarantees that all landscaping included within the commercial portion of this <br />project will be maintained at all times in a manner consistent with the approved <br />landscape plan for this development. Said agreement shall run with the land for the <br />duration of the existence of the structures located on the subject property. <br />70. The project developer shall provide root control barriers and four inch perforated pipes <br />for parking lot trees, street trees, and trees in planting areas Tess than ten feet in width, <br />as determined necessary by the Director of Community Development at the time of <br />review of the final landscape plans. <br />Tree Requirements <br />71. The following statements shall be printed on to the site, grading, and landscape plans <br />where applicable to the satisfaction of the Director of Community Development prior to <br />issuance of a building permit: <br />P14 -0124, P14 -0125, and PUD- 107/377 St. Mary Street Planning Commission <br />13 Of 26 <br />