Laserfiche WebLink
Notwithstanding the foregoing, the State of California's Green Building Standards Code, <br />"CALGreen ", as amended, shall also apply. <br />a. The green building measures shall be shown on one of the first two pages of the <br />plans submitted for issuance of a building permit. Each point identified shall have a <br />notation indicating the sheet the point can be found, and each sheet shall note <br />where the point is located. All proposed green building measures shall be shown <br />throughout the plan set, as appropriate, as determined by the Director of Community <br />Development. <br />b. A special inspection by from the Planning Division shall be coordinated with regards <br />to landscaping, irrigation, and exterior materials. All of the green building measures <br />indicated on the approved checklist shall be inspected and approved by either the <br />City of Pleasanton, a third party rater, or the applicants shall provide written <br />verification by the project engineer, architect, landscape architect, or designer. <br />50. The new residences shall be constructed to allow for future installation of a Photovoltaic <br />(PV) system and solar water heating systems. The project applicant shall comply with <br />the following requirements for making the dwelling photovoltaic -ready and solar- water- <br />heating - ready: <br />a. Electrical conduit and cable pull strings shall be installed from the roof /attic area to <br />the building's main electrical panels; <br />b. An area shall be provided near the electrical panel for the installation of an "inverter" <br />required to convert the direct current output from the photovoltaic panels to <br />alternating current; <br />c. Engineer the roof trusses to handle an additional load as determined by a structural <br />engineer to accommodate the additional weight of a prototypical photovoltaic system <br />beyond that anticipated for roofing. <br />d. Plumbing shall be installed for solar -water heating; and <br />e. Space shall be provided for solar- heating tank. <br />These measures shall be shown on the building permit plan set submitted to the <br />Director of Community Development for review and approval before issuance of the first <br />building permit. <br />51. Only gas fireplaces, pellet fueled wood heaters or EPA certified wood - burning <br />appliances may be installed. <br />52. The applicants shall provide garage doors on the garages of the houses covered by this <br />approval. The door design and material shall be to the satisfaction of the Director of <br />Community Development. <br />P14 -0124, P14 -0125, and PUD- 107/377 St. Mary Street Planning Commission <br />11 of26 <br />