My WebLink
|
Help
|
About
|
Sign Out
ORD 2134
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
1/14/2016 4:04:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2134
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Alarm Permit. The minimum fee for fire alarm system installations and alterations is <br /> $275.00, collected at the time of submittal for plan review. The Fire Alarm Permit fee is based <br /> on the number of hours the Fire Department estimates the field inspection time will entail, plus <br /> administrative and archiving fees. <br /> Hazardous Materials Permit. The initial plan submittal fee for a HazMat review and inspection <br /> of installations involving hazardous materials is $420.00. The Hazardous Materials Permit fee <br /> is based on the Fire Department estimate of field inspection time, plus administrative & <br /> archiving fees. <br /> Development Fees: <br /> Development fees are assessed on all new structures, additions to existing structures and new <br /> residential units. Development Fees are based on the fee in effect at the time of payment, <br /> usually at the Building Permit Issuance. Pre-payment of building permit fees and impact fees <br /> before permit issuance is not permitted. <br /> Any change of use on a parcel triggers a review of the sewer capacity (both DSRSD and City) <br /> and traffic impacts to determine if this creates an increase in demand on the City infrastructure. <br /> In all cases where it is determined that the new use increases demand,a fee is assessed based <br /> on the difference between the previously purchased impact fee or capacity at a space, building or <br /> parcel and the increased impact or capacity demand. <br /> Water Connection Fees <br /> The connection fees for potable water services are based on the size of the water meter(s) <br /> and the rate in effect at the time of payment, not application date. The project designer <br /> determines the size and number of meters needed for the project. The Building and Safety <br /> Division collects water connection fees for one- and two-family residential domestic meters. <br /> The Engineering Division collects water connection fees for all other projects. <br /> Note: Single-family and duplex housing units with fire sprinkler systems on a combined domestic <br /> and fire service connection(up to a maximum 1"meter size) may pay the Zone 7 connection charge <br /> based on the 5/e"meter size. City connection and meter charges are based on the size without <br /> reduction. <br /> No water connection fee is collected for separate private fire service connections. <br /> Meter Meter Gallons Meter Connection Fees Total <br /> Size Type per Min Fee City" Zone 7* (eft.1/01/15) <br /> s/e"x 3/4" Displacement 10 $420 $1,200 $24,830 $26,450 <br /> 3/4" Displacement 15 $470 $1,800 $37,245 $39,515 <br /> 1" Displacement 25 $570 $3,000 $62,075 $65,645 <br /> 1-1/2" Displacement 50 $730 $6,000 $124,150 $130,880 <br /> 2" Displacement 80 $910 $9,600 $198,640 $209,150 <br /> 2" Omni C2 160 $1,640 $9,600 $397,280 $408,520 <br /> 3" "'" 400 $2,050 $21,000 $993,200 $1,016,250 <br /> 4" "`" <br /> 800 $3,280 $60,000 $1,986,400 $2,049,680 <br /> 6" "" 1600 $5,330 $120,000 $3,972,800 $4,098,130 <br /> *3rd party fee collected by the City of Pleasanton for the Zone 7 Water District. <br /> **In the North Pleasanton Improvement District(designated undeveloped parcels within the Hacienda Business Park <br /> &Stoneridge Mall Area)the City connection fee is reduced by approximately 61%. <br /> ***Connection fee,meter type and availability larger than 2"must be verified prior to payment. <br /> Page 3 of 10 <br /> Fees Handout as of 03-16-15 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.