Laserfiche WebLink
approved fire apparatus access roads capable of accommodating fire department <br /> aerial apparatus. Fire apparatus access roads shall have a minimum unobstructed <br /> width of 26 feet in the immediate vicinity of any building or portion of building more <br /> than 30 feet (9144 mm) in height. At least one of the required access routes meeting <br /> this condition shall be located within a minimum of 15 feet (4572 mm) and a <br /> maximum of 30 feet (9144 mm) from the building, and shall be positioned parallel to <br /> one entire side of the building. <br /> e. The carrying capacity of the access route(s) shall be 69,000 pounds under all <br /> weather conditions. <br /> f. Designated construction material storage and construction worker parking shall not <br /> obstruct the emergency vehicle access route(s). <br /> g. On-site fire hydrants shall be in service. Fire hydrants shall be flushed and all valves <br /> open. <br /> Urban Stormwater <br /> 102. The project shall comply with the "Alameda Countywide NPDES Permit#CAS612008 <br /> dated October 14, 2009 and amendments to this permit" issued the by California <br /> Regional Water Quality Control Board, San Francisco Bay Region, a copy of which is <br /> available at the Community Development Department, Public Works/Engineering <br /> section at City offices, Alameda County Clean Water Program and at State Water <br /> Board: <br /> - (http://www.waterboards.ca.gov/sanfranciscobay/water_issues/programs/stormwater <br /> /Municipal/index.shtml.; and <br /> - http://www.waterboards.ca.gov/sanfranciscobay/board_info/agendas/2007/march/ala <br /> meda%20final%20order%20r2-2007-0025.pdf) <br /> 103. The project shall also comply with the "Construction General Permit" by the California <br /> Regional Water Quality Control Board, San Francisco Bay Region. <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/construction.shtml <br /> A. Design Requirements <br /> 104. The NPDES Permit design requirements include, but are not limited to, the following: <br /> a) Source control, sight design measures, and design and implementation of <br /> stormwater treatment measures are required when commercial, industrial or <br /> residential development creates and replaces 10,000 square feet or more of <br /> impervious surface, including roof area, streets and sidewalk. <br /> PUD-109, 273 Spring Street Planning Commission <br /> Page 15 of 22 <br />