Laserfiche WebLink
use tarps on the ground to collect fallen debris or splatters that could contribute to <br /> stormwater runoff pollution. <br /> d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement <br /> and storm drains adjoining the site. Limit construction access routes onto the site <br /> and place gravel on them. Do not drive vehicles and equipment off paved or <br /> graveled areas during wet weather. Broom sweep the street pavement adjoining the <br /> project site on a daily basis. Scrape caked-on mud and dirt from these areas before <br /> sweeping. <br /> e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet <br /> nearest the downstream side of the project site in order to retain any debris or dirt <br /> flowing in the storm drain system. Maintain and/or replace filter materials to ensure <br /> effectiveness and to prevent street flooding. <br /> f) Create a contained and covered area on the site for the storage of cement, paints, <br /> oils, fertilizers, pesticides, or other materials used on the site that have the potential <br /> of being discharged into the storm drain system through being windblown or in the <br /> event of a material spill. <br /> g) Never clean machinery, equipment, tools, brushes, or rinse containers into a street, <br /> gutter, or storm drain. <br /> h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do not <br /> discharge wash water into street, gutters, or storm drains. <br /> i) Equipment fueling area: Use off-site fueling stations as much as possible. Where on- <br /> site fueling occurs, use designated areas away from the storm drainage facility, use <br /> secondary containment and spill rags when fueling, discourage "topping off' of fuel <br /> tanks, place a stockpile of absorbent material where it will be readily accessible, and <br /> check vehicles and equipment regularly for leaking oils and fuels. Dispose rags and <br /> absorbent materials promptly and properly. <br /> j) Concrete wash area: Locate wash out areas away from the storm drains and open <br /> ditches, construct a temporary pit large enough to store the liquid and solid waste, <br /> clean pit by allowing concrete to set, breaking up the concrete, then recycling or <br /> disposing of properly. <br /> k) Equipment and vehicle maintenance area: Use off-site repair shop as much as <br /> possible. For on-site maintenance, use designated areas away from the storm <br /> drainage facility. Always use secondary containment and keep stockpile of cleanup <br /> materials nearby. Regularly inspect vehicles and equipment for leaks and repair <br /> quickly or remove from the project site. Train employees on spill cleanup <br /> procedures. <br /> P14-0124, P14-0125, and PUD-107/377 St. Mary Street Planning Commission <br /> 22 of 26 <br />