hydroseeding, hay bales, sandbags, and siltation fences and are subject <br /> to the review and approval of the City Engineer/Chief Building and Safety <br /> Official. If no grading plan is required, necessary erosion control/ <br /> stormwater quality measures shall be shown on the site plan submitted for <br /> an on-site permit, subject to the review and approval of the Building and <br /> Safety Division. The project applicant or developer is responsible for <br /> ensuring that the contractor is aware of and implements such measures. <br /> b. All cut-and-fill slopes shall be revegetated and stabilized after completion <br /> of grading, but in no case later than October 15. Hydroseeding shall be <br /> accomplished before September 15 and irrigated with a temporary <br /> irrigation system to ensure that the grasses are established before <br /> October 15. No grading shall occur between October 15 and April 15 <br /> unless approved erosion control/stormwater quality measures are in place, <br /> subject to the approval of City Engineer/Chief Building and Safety Official. <br /> Such measures shall be maintained until such time as permanent <br /> landscaping is place. <br /> c. Gather all sorted construction debris on a regular basis and place it in the <br /> appropriate container for recycling; to be emptied at least on a weekly <br /> basis. When appropriate, use tarps on the ground to collect fallen debris <br /> or splatters that could contribute to stormwater runoff pollution. <br /> d. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom sweep <br /> the street pavement adjoining the project site on a daily basis. Scrape <br /> caked-on mud and dirt from these areas before sweeping. <br /> e. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to retain <br /> any debris or dirt flowing in the storm drain system. Maintain and/or <br /> replace filter materials to ensure effectiveness and to prevent street <br /> flooding. <br /> f. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain system <br /> through being windblown or in the event of a material spill. <br /> g. Never clean machinery, equipment, tools, brushes, or rinse containers into <br /> a street, gutter, or storm drain. <br /> h. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into street, gutters, or storm drains. <br /> Page 27 of 31 <br />