Laserfiche WebLink
TRADE ONLY PERMIT-ELECTRICAL FEES WORKSHEET <br /> ITEM UNIT PRICE <br /> Electrical Permit Issuance Fee 523.50 <br /> New Single-Family Dwelling Electrical Permit Fee SO 056 per square foot <br /> New Multi-Family Dwelling Electrical Permit Fee $0.050 per square foot <br /> Electrical Plan Review Fee 25%of Electrical Permit fee, minimum one-hour, <br /> 5130.00 <br /> Additional Plan Review(more than one initial recheck, Minimum one-hour,5130.00,or based upon review <br /> or for revisions to previously approved plans) time multiplied by the current reviewer rate, plus a <br /> 520 00 admin fee <br /> Appliances S4.75 each <br /> Busways S7.25 per 100 lineal feet <br /> General Circuits 55.25 per circuit <br /> Generators(under 10 kVA) $23.50 each <br /> Lighting Fixtures <br /> First 20 fixtures S1.10 each <br /> Fixtures exceeding 20 $0.73 each <br /> Miscellaneous Electrical Apparatus $18.20 each <br /> Motors or Generators <br /> Up to 1 HP (5 1 kVA) 54.75 each <br /> Up to 10 HP (<_10 kVA) $12.30 each <br /> Up to 50 HP (5 50 kVA) S24.60 each <br /> Up to 100 HP (5 100 kVA) S49.50 each <br /> Over 100 HP (> 100 kVA) S74.50 each <br /> Photo-Voltaic Systems,Residential <br /> Up to 15kW $150.00, plus one-hour plan review fee <br /> Over 15kW $370.00, plus$15 per additional kW above 15, and <br /> one-hour plan review fee <br /> Photo-Voltaic Systems, Non-Residential <br /> Up to 50kW S240 min,$16 per kW, plus two-hour plan review fee <br /> Over 50kW S12 per kW,plus S5 per additional kW above 50,and <br /> four-hour plan review fee <br /> Receptacles,Switches,Other Outlets <br /> First 20 outlets $1.10 each <br /> Outlets exceeding 20 $0.73 each <br /> Electrical panels <br /> Up to 199 amp (under 600 volts) S30.50 each <br /> Up to 999 amp(under 600 volts) S62.15 each <br /> 1000 amp or more(under 600 volts) S124.30 each <br /> All panelboards over 600 volts S124.30 each <br /> Signs,marquees S24.60 each <br /> Private Spa or Swimming Pool S49.50 each <br /> Temporary Power(Pole or Pedestal) S23.50 each <br /> Temporary Power Distribution(for construction sites, 512.30 each <br /> seasonal lots,etc., per pole or pedestal) <br /> Transformers S66.50 each <br /> REVISED:Mar 16,2015.Jan 1,2015,July 1,2014;Apnl 1,2014.Jan.1,2014;Oct 31,2013;July 1,2013;March 1,2013:Jan 1.2013 <br /> March 1.2012;Jan 1.2012,Oct 6,2011:July 1.2011:March 1,2011:Jan 1.2011:Nov 15,2010.Aug 1,2010;July 1,2010,Feb 24, <br /> 2010:Jan 1,2009;Oct 30.2008.July 1,2008.Jan 1.2008.Dec 10,2007:Jan 3.2007.Jan 1.2007;Dec 1.2006,Nov 13,2006,July <br /> 14,2006;Jan 3,2006.July 14.2005:Nov 7,2004,July 2,2004, May 10,2004,March 3,2003;Jan 31,3004.April 12,2002.March 15. <br /> 2002,Sept 6,2001,Jan 5,2001 <br /> Page 10 of 10 <br /> Fees Handout as of 03-16-15 <br /> 11 <br />