My WebLink
|
Help
|
About
|
Sign Out
RES 15810
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 2:50:49 PM
Creation date
12/29/2015 2:50:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 15810
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Measure 4.4-2c: All landscaped slopes shall be maintained in a vegetated state after project <br /> completion using drought-tolerant vegetation requiring infrequent drip irrigation.No pressurized <br /> irrigations shall be placed at or near the tops of graded slopes. <br /> Significant Impact <br /> Impact 4.4-3: Some residences would be constructed near slopes with colluvial materials. These slopes, <br /> and slopes constructed as part of the project, could become unstable and potentially result in on-or off- <br /> site damage. <br /> Finding <br /> Changes or alterations have been required in, or incorporated into,the project which mitigate or avoid the <br /> significant effects on the environment. <br /> Facts in Support of Finding <br /> The City of Pleasanton has adopted the following measures which will reduce potential impacts related to <br /> slopes with colluvial deposits to a less-than-significant level: <br /> Mitigation Measure 4.4-3a: Debris catchment walls shall be constructed along the rear sides of the <br /> building pads on Lots 14, 15, and 22 through 25 where they border adjacent slopes. The walls shall be a <br /> minimum of 5 feet high and designed in accordance with the recommendations of the geotechnical <br /> exploration in regards to retaining walls. Walls may not be required if pad grading provides sufficient <br /> space via rear yard slopes or retaining walls. The final design of the walls or catchment area shall be <br /> reviewed by ENGEO when the detailed project plans are prepared. Proper access to the catchment areas <br /> shall be provided and all debris catchment walls or designated catchment areas shall be periodically <br /> maintained by removing and disposing of accumulated slope detritus. <br /> Mitigation Measure 4.4-3b: Debris catchment measures shall be constructed along Lots 5 and 25 which <br /> are located at the mouths of existing drainage courses. The catchment measures shall include a minimum <br /> 5-foot berm placed across the mouth of the drainage with clog-resistant surface drainage inlets provided. <br /> The final dimensions, placement, and design shall be determined in the detailed project plans. <br /> Mitigation Measure 4.4-3c: The final corrective grading plans shall show detailed locations of keyways, <br /> subdrains, debris benches, and subexcavation areas. The sequence of grading issues, such as placement of <br /> various cut materials in specific locations, should also be evaluated during review of the final 40-scale <br /> grading plans. <br /> Mitigation Measure 4.4-3d: The Geotechnical Engineer or qualified representative should be present <br /> during all phases of grading operations to observe demolition, site preparation, grading operations,and <br /> subdrain placement. After grading operations commence, geologic observations of cut areas should be <br /> made at frequent intervals so that revised geologic recommendations can be incorporated into updated <br /> grading plans as grading proceeds. During slope grading, all cut slopes should be viewed by the <br /> Engineering Geologist for adverse bedding, seepage, or bedrock conditions that may affect slope stability. <br /> In the event that adverse conditions are identified, overexcavation and reconstruction of the slopes may be <br /> required. Track rolling to compact slope faces is not sufficient. All fill slopes should be overbuilt at least <br /> two feet and cut back to design grades. <br /> Mitigation Measure 4.4-3e: Keyways equipped with a subsurface drainage system shall be constructed. <br /> Each keyway shall be keyed into firm natural materials unaffected by shrinkage cracks. The keyway shall <br /> be filled with materials derived from the Livermore Gravels compacted to 95 percent relative compaction <br /> for non-expansive materials and 90 percent relative compaction for expansive materials. The required <br /> LUND RANCH II(PUD-25)RESIDENTIAL PROJECT 11 FINDINGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.