My WebLink
|
Help
|
About
|
Sign Out
RES 15811
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 2:44:12 PM
Creation date
12/29/2015 2:44:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 15811
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> .Implementation • Monitoring Monitoring and Monitoring Verification of <br /> Mitigation'Measures .Procedures Responsibility Reporting Action Schedule Compliance • <br /> Mitigation Measure 4.12-2: Contingency Plan.The The project sponsor Community Verify that the Prior to issuance Verified by: <br /> project sponsor shall require the construction shall prepare a Development Contingency Plan of grading or <br /> contractor(s)to observe for previously unidentified Contingency Plan Department; is adequate. building permit, <br /> hazardous materials and have a contingency plan for that establishes Engineering whichever is <br /> sampling and analysis of potential hazardous materials protocols for the Division sooner. <br /> in soil. If any hazardous materials are identified,the identification of Date: <br /> contractor(s)shall be required to prepare a Health and previously <br /> Safety Plan,conduct sampling to assess the chemicals unidentified <br /> present, and identify appropriate disposal methods. hazardous <br /> Evidence of potential contamination includes soil materials. <br /> discoloration, suspicious odors, the presence of USTs, <br /> or the presence of buried building materials. The project <br /> sponsor shall also be required to notify the regulatory <br /> agencies if the concentration of any chemical exceeds <br /> its respective screening level.The assigned lead agency <br /> shall oversee all aspects of the site investigation and <br /> remedial action and determine the adequacy of the site <br /> investigation and remediation activities at the site. <br /> Mitigation Measure 4.12-3: Prior to demolition of the Project applicant Community Verify the Prior to issuance Verified by: <br /> on-site buildings,the project sponsor shall ensure that a shall hire a Development completion of of demolition <br /> Hazardous Building Materials Survey is completed by a Registered Department; required surveys; permit; inspect <br /> Registered Environmental Assessor or a registered Environmental Engineering conduct field during <br /> engineer to confirm the absence or presence of Assessor or a Division inspection during construction. <br /> asbestos-containing materials and lead-based paint in registered engineer demolition to verify Date: <br /> structures to be demolished.This survey shall be to conduct appropriate <br /> completed prior to any demolition activities associated appropriate handling of <br /> with the project. Adequate abatement practices, such as survey(s)that hazardous <br /> containment and/or removal for all asbestos-containing confirm the materials. <br /> materials and lead-based paint, shall be implemented in absence or <br /> accordance with applicable laws prior to demolition. Any presence of <br /> PCB-containing equipment,fluorescent light tubes asbestos- <br /> containing mercury vapors,and fluorescent light ballasts containing <br /> containing DEHP shall also be removed and legally materials, lead- <br /> disposed of. based paint, PCBs, <br /> and DEHP. <br /> 17 <br /> LUND RANCH I I—PUD-25 JUNE 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.