Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Implementation Monitoring' Monitoring and Monitoring Verification of <br /> , Mitigation.Measures Procedures . Responsibility • Reporting Action Schedule • Compliance - . <br /> Mitigation Measure 4.5-3: See Mitigation Measures See Mitigation See Mitigation See Mitigation See Mitigation Verified by: <br /> 4.4-2a through 4.4-2c in Section 4.4, Geology, Soils, and Measures 4.4-2a Measures 4.4-2a Measures 4.4-2a Measures 4.4-2a <br /> Seismicity. through 4.4-2c. through 4.4-2c. through 4.4-2c. through 4.4-2c. <br /> Date: <br /> Mitigation Measure 4.5-4: The project sponsor, Project applicant Community Verify the Prior to issuance Verified by: <br /> working with the Alameda Countywide Clean Water shall prepare Development preparation of of grading permit. <br /> Program, shall implement a program to educate buyers appropriate Department; stormwater <br /> about the potential water quality effects of stormwater stormwater Planning Division pollution/ <br /> pollution and effective measures to prevent the pollution/hazardous and Engineering hazardous waste <br /> generation of stormwater pollutants from residential land waste informational Division educational Date: <br /> uses. At a minimum, the program shall address materials for program and <br /> stormwater pollutants such as hazardous materials distribution to and associated <br /> commonly used in household applications; spilled oil, use by project materials;verify <br /> fuel, and other fluids such as antifreeze from vehicles; residents. inclusion of <br /> construction debris; landscape chemicals such as materials as part <br /> pesticides, herbicides, and copper-based algaecides; of buyer purchase <br /> used packing materials; paint products;trash and litter; agreement. <br /> excess irrigation; and car washing. Educational materials <br /> developed under this program shall identify alternative <br /> products that are more environmentally friendly as well <br /> as methods to control stormwater pollutants at their <br /> source.The materials shall also be consistent with <br /> materials available from the Alameda Countywide Clean <br /> Water Program and shall be provided to the buyer at the <br /> time of purchase. <br /> 4.6 Traffic and Circulation <br /> Mitigation Measure 4.6-2 (applies to all alternative Project applicant Community Calculate the fees Prior to issuance Verified by: <br /> access scenarios):The project's impact on study shall contribute fair- Development and confirm receipt of building <br /> intersections would be mitigated by the payment of traffic share funds for Department,Traffic of payment. permits. <br /> impact fees,which is proposed by the project applicant traffic impact fees Division <br /> The need to signalize the Sunol Boulevard/I-680 <br /> Northbound Ramp and Sunol Boulevard/I-680 Date: <br /> Southbound Ramp intersections have been identified in <br /> the City's General Plan as future planned improvements <br /> to which the project would contribute through the <br /> payment of traffic impact fees.With signalization,these <br /> intersections would operate at acceptable service levels, <br /> reducing this impact to a less-than-significant level. <br /> 4.7 Noise <br /> 10 <br /> LUND RANCI I II-PUD-25 JUNE 2015 <br />