Laserfiche WebLink
Scope of Work • 1 ` <br /> i upf1T= 'tr>r)ci_ a ,1,,1%?EIFf;i 6 <br /> The following describes the specific tasks Fehr&Peers -s <br /> The following work scope provides details on specific will undertake to update the 2009 model,including <br /> tasks that were outlined in the Request for Proposals, calibration/validation to a 2015 base year and <br /> with tasks separated for the Model Update,Baseline development of an Existing Plus Approved Projects <br /> Report and On-going Support.Many of the tasks within (EPAP)and Cumulative models.As part of this task,we <br /> the model update and baseline report phase are propose to convert the existing Cube Voyager model <br /> intended to be conducted in parallel,as the outputs into Cube Catalog.Catalog offers benefits over the ;d <br /> from one task become inputs to others.The tasks are Voyager platform such as scenario management,user <br /> generally presented in the order in which they will be management and reporting.The Catalog platform it <br /> undertaken,although many modeling tasks are iterative allows all model files to be maintained in one file, <br /> by nature and there will be some feedback between reducing the potential for errors and allowing for 1 <br /> tasks.City staff may elect to have us do some or all of multiple scenarios to be evaluated. <br /> these tasks;some tasks may be undertaken by staff,or it il <br /> may be decided that certain tasks are not necessary in Task 3.1:Model Network <br /> this situation.We are open to discussing all of the Fehr&Peers will work closely with the City and other <br /> options with staff. stakeholders to compile a list of roadway improvements <br /> ________—___—______ ___.________ that were completed between 2009 and 2015 that rI'B <br /> :7s i i;c 1 — '.':'DEL i:;'D;TE should be reflected in the updated base year model,and <br /> -- ---— - - - - planned improvement projects that should be included <br /> T ,:•. i i r: r f in the future year models.We will also review the <br /> We start each model update exercise with an initial kick- placement of centroid connectors. <br /> off meeting with City staff and other stakeholders,to As part of this task,we will develop a master network 9 <br /> discuss issues with the current model and desires for the Cube Geodatabase file.Using a geodatabase will allow <br /> updated model,and review data needs and availability. the City to store and edit files from a central location. -9 <br /> Outcomes of this meeting include: The City currently maintains the network files in GIS <br /> shape file so storing the files in a geodatabase will <br /> • Finalized scope of work facilitate the editing and transfer of files adding to the <br /> • Refined project schedule ease of use. 3 <br /> • List of data needs For areas outside Pleasanton,we will review the most <br /> current version of the Alameda CTC model networks and <br /> - develop a list of roadway improvements in Dublin and <br /> Using the most current version of the 2009 model,Fehr ..:Livermore to include in the updated model.This list will <br /> &Peers will review the model,including roadway be provided to City of Pleasanton staff for review prior <br /> network,land use inputs and model functionality,and to the master network being updated. 1 <br /> summarize the results in tabular format.Network maps ,$ <br /> will also be created.The intent of this task is to convey Task 3.2:Land Use Review ,i, <br /> the complex model information in an easy to read It is our understanding that City of Pleasanton staff is ._.,, <br /> format.This concise summary will highlight areas of taking the lead on updating the 2009 land use files to 'a <br /> further refinement and will be incorporated into the reflect development that has occurred since 2009 to —, <br /> model documentation.The review will be broadly create a new base year land use database,and is <br /> subcategorized into the following topic areas: reviewing other planning documents,including the <br /> City's Housing Element to update the EPAP and '' <br /> • Network Cumulative land use files.As part of this task,Fehr& -gi <br /> • Data Collection Peers will summarize the Base Year,EPAP and <br /> • Land Use Cumulative scenario land use files In a tabular and 1 <br /> • TAZ structure including school Zones graphical format.The projected growth will be <br /> • Trip Generation compared to other published documents.Fehr&Peers ' <br /> • Trip Distribution will flag potential land use issues,such as negative <br /> • Mode Choice growth within a TAZ or unexpected land use changes, 3 <br /> • Feedback mechanisms such as commercial development occurring in a <br /> • Assignment primarily residential zone,for City staff review. 7, <br /> • Miscellaneous <br /> 3 <br /> 1 <br /> 6 <br />