My WebLink
|
Help
|
About
|
Sign Out
08 ATTACHMENTS 1- 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
120115
>
08 ATTACHMENTS 1- 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 2:37:56 PM
Creation date
11/12/2015 11:13:56 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
15Y
DOCUMENT NO
08 ATTACHMENTS 1-6
NOTES
THIS ITEM WAS CONTINUED FROM 11-3-2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CEQA FINDINGS OF FACT <br /> FOR <br /> LUND RANCH II (PUD-25) PROJECT <br /> SECTION 1 STATEMENT OF FINDINGS <br /> INTRODUCTION <br /> Greenbriar Homes Communities is requesting approval of a Planned Unit Development(PUD) <br /> development plan,which would allow the construction of a total of 50 residential units on the I95-acre <br /> Lund Ranch II property. The project site is presently designated for Rural Density(1 dwelling unit per 5 <br /> gross acres) and Low Density(less than 2 dwelling units per gross acres) Residential uses. The subject <br /> property is zoned"PUD-LDR/OS,"Planned Unit DevelopmentâLow Density Residential)District. The <br /> project plans designate the majority of the Lund Ranch property for open space uses. Approximately 161 <br /> acres(83%)of the site would be dedicated for public open space use, while 11.1 acres of the two estate <br /> lots would be undeveloped private open space area. The public open space would be owned by the City <br /> and maintained by either the City or the development's homeowners' association (HOA). <br /> The City of Pleasanton("City"), as lead agency, prepared a Draft Environmental Impact Report(EIR)for <br /> the Project in July, 2014 (State Clearinghouse No. 2003092021)1. This document was made available for <br /> review on July 15, 2014, for a forty-five (45) day review period. Accordingly, written comments were <br /> solicited until September 2, 2014. The City of Pleasanton prepared responses to comments on the Draft <br /> EIR, and published both comments and responses to comments in the January 2015 Final EIR,which was <br /> distributed on January 12,2015. <br /> These findings have been prepared in accordance with the California Environmental Quality Act(CEQA) <br /> (Pub. Resources Code, § 21000 et seq.) and its implementing guidelines ("CEQA Guidelines")(Cal. Code <br /> Regs.,tit. 14, § 15000 et seq.). <br /> FINDINGS REQUIRED UNDER CEQA <br /> Public Resources Code section 21002 provides that"public agencies should not approve projects as <br /> proposed if there are feasible alternatives or feasible mitigation measures available which would <br /> substantially lessen the significant environmental effects of such projects[.]"The same statute provides <br /> that the procedures required by CEQA"are intended to assist public agencies in systematically identifying <br /> both the significant effects of Projects and the feasible alternatives or feasible mitigation measures which <br /> will avoid or substantially lessen such significant effects." Section 21002 goes on to provide that"in the <br /> event [that] specific economic, social, or other conditions make infeasible such project alternatives or <br /> such mitigation measures, individual projects may be approved in spite of one or more significant effects <br /> thereof" <br /> 1 See Cal.Code Regs.,tit. 14,section 15367 for a definition of"lead agency." <br /> LUND RANCH 11(PUD-25)RESIDENTIAL PROJECT 1 FINDINGS <br />
The URL can be used to link to this page
Your browser does not support the video tag.