My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS 1- 6
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
110315
>
11 ATTACHMENTS 1- 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 3:37:29 PM
Creation date
10/14/2015 3:48:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/3/2015
DESTRUCT DATE
15Y
DOCUMENT NO
11 ATTACHMENTS 1-6
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63. All residences in the PUD shall be constructed to allow for future installation of a <br /> photovoltaic- and solar-water-heating system. The project/building applicant or <br /> developer shall comply with the following requirements for making all units on the <br /> subject site photovoltaic- and solar water-heating ready. Making the units <br /> photovoltaic-and solar water-heating ready shall require the following measures <br /> to be implemented with the construction of the structures: <br /> a) Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels; <br /> b) An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the <br /> photovoltaic panels to alternating current; <br /> c) Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a prototypical <br /> photovoltaic system beyond that anticipated for roofing; <br /> d) Plumbing shall be installed for solar-water heating; and, <br /> e) Space shall be provided for a solar-water-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of <br /> the first building permit. <br /> 64. The project applicant or developer shall provide the future homeowners the <br /> necessary information identifying the means by which photovoltaic panels can be <br /> applied to the roofs of the structures covered by this approval. This information <br /> shall be submitted to the Director of Community Development for review and <br /> approval prior to the occupancy of the first unit. <br /> 65. All HVAC condensing units shall be located on the plans. <br /> 66. All indoor and outdoor fireplaces shall be gas fireplaces, pellet fueled wood <br /> heaters, or EPA certified wood-burning appliances. The fireplace type shall be <br /> indicated on the floor plan and/or specification sheet(s) submitted for issuance of <br /> building permits. <br /> 67. All conditions of approval and Final EIR mitigation measures shall be attached to <br /> all construction and landscaping permit plan sets submitted for review and <br /> approval, whether stapled to the plans or located on a separate plan sheet. <br /> 68. Planning Division approval is required before any changes are implemented in <br /> site design, grading, house design, house colors or materials, green building <br /> measures, landscape material, etc. <br /> Page 13 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.