My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
102015
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 1:57:41 PM
Creation date
10/14/2015 1:53:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/20/2015
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For the Transportation Development Impact Fee (TDIF) study, Fehr& Peers will undertake the <br /> following efforts: <br /> o Obtain a complete set of model files for the City of Pleasanton model, do a basic <br /> reasonableness check on the land use and roadway network inputs for both the base year <br /> and future year, and confirm the input assumptions with City staff. This review should <br /> consider the land use projections recently developed by the City of Dublin, particularly <br /> for those areas near the boundary between the two cities, to ensure that the land use <br /> inputs seem reasonable. (Note that the City of Pleasanton is in the early stages of <br /> updating the local travel model. We plan to use the most recent version of the model <br /> available at the time of this TDIF study.) <br /> o Obtain available traffic count data from the City, from recent planning and transportation <br /> studies undertaken in the vicinity, and from other relevant sources (such as Caltrans). <br /> o Review the existing Traffic Development Fee program established in 1998, as well as the <br /> fee program update study conducted in 2010 that was never adopted. We will review the <br /> methodology from the 2010 study and provide our thoughts on its applicability for this <br /> current situation. <br /> o Recommend an approach for establishing the nexus between new development in <br /> Pleasanton and the need for the transportation capital improvements, and discuss with the <br /> City and consultant team. <br /> Task 3: Public Facilities and Cost Estimates <br /> The goal of this task will be to define the list of facilities and associated costs that will be <br /> covered in whole or in part by the fee program. As a starting point, the EPS Team will review the <br /> list of facilities that underlies the current fee program and what items need to be revised, <br /> removed, or added to orient the facility list to serve future growth. Input from City Department <br /> staff on long-term capital goals, service standards, and feedback on the relevance of the facilities <br /> included in the current fee program will be solicited through a combination of structured <br /> questionnaires and interviews. <br /> While the impact fee is expected to include parkland, open space, and trails, public facilities <br /> (including land and buildings), transportation (streets, sidewalks, and bicycle paths), water and <br /> sewer facilities, and affordable housing, other appropriate capital needs will be considered. <br /> Given EPS experience with similar communities, we understand the wide range of public <br /> facilities that can be included(including, for example a General Plan Update fee, Technology <br /> Fee, childcare fee, and others). <br /> Once a list of required infrastructure and community facilities is compiled and vetted, the EPS <br /> team will develop planning-level cost estimates using unit costs based on standard industry <br /> sources and City staff experience on local facility costs. BKF Engineers will also review these <br /> estimates as needed, focusing on the water and sewer infrastructure cost estimates, building on <br /> the recently completed studies, as appropriate. It is assumed that the cost for preparing the <br /> Impact Fee program will be recovered as an administrative factor in the nexus analysis. <br /> 71Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.