My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
102015
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2015 11:55:11 AM
Creation date
10/14/2015 1:49:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/20/2015
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
154. All buildings undergoing construction, alteration or demolition shall comply with <br /> Chapter 14 (California Fire Code currently in effect) pertaining to the use of any <br /> hazardous materials, flame-producing devices, asphalt/tar kettles, etc. <br /> URBAN STORMWATER CONDITIONS <br /> 155. The project shall comply with the NPDES Permit No. CAS612008, dated October <br /> 14, 2009, and amendments, issued the by California Regional Water Quality <br /> Control Board, San Francisco Bay Region, a copy of which is available at the <br /> Community Development Department, Public Works/Engineering section at City <br /> offices, Alameda County Clean Water Program, State Water Board, and at the <br /> following websites: <br /> http://www.waterboards.ca.gov/sanfranciscobav/water issues/programs/stormwate <br /> r/M u n icipa I/index.shtm I; <br /> and <br /> http://www.waterboards.ca.qov/sanfranciscobav/board info/agendas/2007/march/a <br /> la meda%20final%20order%20r2-2007-0025.pdf <br /> The project shall comply with the "Construction General Permit" as required by the <br /> San Francisco Bay Regional Water Quality Control Board: <br /> (http://www.waterboards.ca.00v/water issues/programs/stormwater/construction.s <br /> html) <br /> A. Design Requirements <br /> 1. The NPDES Permit design requirements include, but are not limited to, the <br /> following: <br /> a) Source control, sight design measures, and design and implementation of <br /> stormwater treatment measures are required when commercial, industrial or <br /> residential development creates and replaces 10,000 square feet or more of <br /> impervious surface, including roof area, streets and sidewalk. <br /> b) Hydro-modification standards are required when a new development or <br /> redevelopment project creates and replaces total impervious area of one <br /> acre or more. <br /> c) The NPDES Permit requires a proactive Diazinon pollutant reduction plan <br /> (aka Pesticide Plan) to reduce or substitute pesticide use with less toxic <br /> alternatives. <br /> d) The NPDES Permit requires complying with the Copper Pollutant Reduction <br /> Plan and the Mercury Pollutant Reduction Plan. <br /> 2. The following requirements shall be incorporated into the project: <br /> 24 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.