OPTION B: PAYMENT AT TIME OF DELIVERY / ACCEPTANCE_
<br /> # Description 1 Unit 2 Units 3 Units
<br /> A Three(3) Pierce Quantum 1500 GPM Pumpers 558,699.64 1,117,399.28 1,676,098.92
<br /> B Fire Fighting Equipment 20,645.63 41,291.26 61,936.89
<br /> C Communications Package 17,820.00 35,640.00 53,460.00
<br /> Two(2) Factory Inspection Trips(5 LPFD representatives on
<br /> D pre-construction, 4 LPFD representatives on final inspection) 5,445.00 10,890.00 16,335.00
<br /> E Delivery/Dealer Preparation 4,300.00 _ 8,600.00 12,900.00
<br /> F Performance Bond 1,805.59 3,611.18 5,416.77
<br /> G SUBTOTAL 608,715.86 1,217,431.72 1,826,147.58
<br /> H State Sales Tax @ 9.50% 57,828.01 115,656.02 173,484.03
<br /> I TOTAL PURCHASE PRICE 666,543.87 1,333,087.74 1,999,631.61
<br /> OPTION B- PAYMENT AT TIME OF DELIVERY/ACCEPTANCE TERMS AND CONDITIONS:
<br /> 1. Livermore Pleasanton Fire Department shall pay the purchase price of$1,999,631.61 for the Product
<br /> within thirty (30) calendar days after the Product departs the manufacturing facility.
<br /> 2. If payment of$1,999,631.61 is late, $345.00 per calendar day will be added to the final invoice.
<br /> Said apparatus and equipment are to be built and shipped in accordance with the specifications hereto attached, delays
<br /> due to strikes, war, or intentional conflict, failures to obtain chassis, materials, or other causes beyond our control not
<br /> preventing, within about 295 TO 325 calendar days after receipt of this order and the acceptance thereof at our office at
<br /> Appleton,Wisconsin, and to be delivered to you at PLEASANTON, CALIFORNIA.
<br /> The specifications herein contained shall form a part of the final contract, and are subject to changes desired by the
<br /> purchaser, provided such alterations are interlined prior to the acceptance by the company of the order to purchase, and
<br /> provided such alterations do not materially affect the cost of the construction of the apparatus.
<br /> The proposal for fire apparatus conforms with all Federal Department of Transportation (DOT) rules and regulations in
<br /> effect at the time of bid, and with all National Fire Protection Association (NFPA) Guidelines for Automotive Fire Apparatus
<br /> as published at the time of bid, except as modified by customer specifications. Any increased costs incurred by first party
<br /> because of future changes in or additions to said DOT or NFPA standards will be passed along to the customers as an
<br /> addition to the price set forth above.
<br /> Any Purchase Order(PO) issued as a result of this proposal should be made out to Pierce Manufacturing Inc.
<br /> Unless accepted by August 31, 2015, the right is reserved to withdraw this proposition.
<br /> Respectfully Submitted,
<br /> Iii
<br /> Authorized Sales Representative
<br /> 2
<br />
|