My WebLink
|
Help
|
About
|
Sign Out
ORD 2127
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
9/15/2015 1:33:47 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2127
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the site that have the potential of being discharged into the storm drain <br /> system by being windblown or by being spilled. <br /> vii. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> viii. Ensure that concrete/gunite supply trucks or concrete/plaster <br /> operations do not discharge wash water into a street, gutter, or storm <br /> drain. <br /> ix. Equipment fueling area Of used at the construction site): use a <br /> designated area away from the storm drainage facility; use secondary <br /> containment and spill rags when fueling; discourage "topping off' of <br /> fuel tanks; place a stockpile of absorbent material where it will be <br /> readily accessible; check vehicles and equipment regularly for leaking <br /> oils and fuels; and dispose of rags and absorbent materials promptly <br /> and properly. Use of an off-site fueling station is strongly encouraged. <br /> x. Concrete wash area: 1) locate wash out area away from storm drains <br /> and open ditches; 2) construct a temporary pit large enough to store <br /> the liquid and solid waste; 3) clean the pit by allowing concrete to set; <br /> 4) break up the concrete; and then 5) recycle or dispose of properly. <br /> xi. Equipment and vehicle maintenance area is not permitted; use an off- <br /> site repair shop is strongly encouraged. <br /> 2. Within 30 days of the installation and testing of the stormwater facilities, the <br /> designer of the site shall submit a letter to City Project Inspector/Construction <br /> Services Manager certifying the devices have been constructed in <br /> accordance with the approved plans for stormwater and C3 design for the <br /> project. The letter shall request an inspection by City staff. <br /> C. Operation and Maintenance Requirements <br /> The project shall comply with the operation and maintenance requirements of the <br /> NPDES Permit. All regulated projects (such as commercial and industrial projects) that <br /> create and/or replace 10,000 square feet or more of impervious areas shall enter into a <br /> recorded Stormwater Operation and Maintenance (O&M) Agreement for treating <br /> stormwater runoff from the site in perpetuity. The agreement is required to be recorded <br /> at the Alameda County Recorder's Office in a format approved by the City. <br /> 1. The Operation and Maintenance Agreement shall clarify that the property <br /> owner(s) of the site shall be responsible for the following in perpetuity: <br /> a. Maintaining all private stormwater treatment measures on the project <br /> site. <br /> b. Annually submitting a maintenance report to the City Operations <br /> Services Department, Utilities Division, addressing the implementation <br /> of the Operation and Maintenance Agreement requirements. <br /> The final signed and notarized Operation and Maintenance Agreement shall <br /> be submitted to the Engineering Division prior to project receiving final <br /> discretionary approval by the Zoning Administrator, Planning Commission, or <br /> 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.