My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
090115
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2015 2:47:03 PM
Creation date
8/26/2015 2:46:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/1/2015
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Fire <br /> 109. The project developer shall keep the site free of fire hazards from the start of lumber <br /> construction until the final inspection. <br /> 110. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major fire. <br /> 111. All fire sprinkler system water flow and control valves shall be complete and serviceable <br /> prior to final inspection. Prior to the occupancy of a building having a fire alarm system, <br /> the Fire Department shall test and witness the operation of the fire alarm system. <br /> 112. All commercial, industrial, and multi-family residential occupancies shall have valve <br /> tamper and water flow connected to an Underwriters Laboratory (UL) listed Central <br /> Station Service. Fire Department plan check includes specifications, monitoring <br /> certificate(s), installation certificate and alarm company U.L. certificate. Fire alarm <br /> control panel and remote annunciation shall be at location(s) approved by the Fire <br /> Prevention Bureau. All systems shall be point identified by individual device and <br /> annunciated by device type and point. <br /> 113. A Hazardous Materials Declaration shall be provided for this tenant and/or use. The <br /> form shall be signed by the owner/manager of the company occupying the <br /> suite/space/building. No building permit will be issued until the Hazardous Materials <br /> Declaration is provided. The form is available through the permit center or from the <br /> LPFD Fire Prevention Bureau. <br /> 114. Should any operation or business activity involve the use, storage or handling of <br /> hazardous materials, the firm shall be responsible for contacting the LPFD prior to <br /> commencing operations. Please contact the Hazardous Materials Coordinator at <br /> 925/454-2361. <br /> 115. The proposed building(s) may have additional Fire Department requirements that can <br /> only be addressed by knowing the details of occupancy. These occupancy details shall <br /> be submitted to the Fire Department prior to submittal of construction plans to the <br /> Building Department. Details shall include but not be limited to the following: <br /> A. Type of storage <br /> B. Height of storage <br /> C.Aisle spacing <br /> D. Rack of bulk storage <br /> E. Palletized storage <br /> F. Type of occupancies within areas of the building(s) <br /> Based on the information received, there may be additional requirements such as: <br /> smoke and heat venting, in-rack sprinklers, increases in sprinkler design criteria, draft <br /> curtains, etc. <br /> 116. The following items will be provided prior to any construction above the foundation or <br /> slab. NOTE: Periodic inspections will be made for compliance. <br /> a. Emergency vehicle access shall be provided to the site. If Public Works <br /> Improvements are part of the project to access the site, an emergency vehicle <br /> access plan shall be submitted for review and approval. <br /> b. Site access shall be provided prior to any construction above the foundation or <br /> slab. Based on the Site Plan Approval the access shall be installed. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.