My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
090115
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2015 2:42:36 PM
Creation date
8/26/2015 2:42:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/1/2015
DESTRUCT DATE
15Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20.70.060 Permit Review and Inspection Requirements <br /> A. The Community Development Director shall implement an administrative, nondiscretionary <br /> review process to expedite approval of small residential rooftop solar energy systems. The <br /> Building Division shall issue a building permit, the issuance of which is nondiscretionary, on <br /> the same day for over-the-counter applications or within 1-3 business days for electronic <br /> applications upon receipt of a complete application that meets the requirements of the <br /> approved checklist and standard plan. <br /> B. If the Building Division finds, based on substantial evidence, that the solar energy system <br /> could have a specific, adverse impact upon public health and safety, the applicant may be <br /> required to apply for a use permit. Review of the application shall be limited to the City's <br /> review of whether the application met local, State, and Federal health and safety <br /> requirements. <br /> C. The Building Division may deny an application for a use permit if the Chief Building Official <br /> makes written findings, based upon substantive evidence in the record, that the proposed <br /> installation would have a specific, adverse impact upon public health or safety and there is no <br /> feasible method to satisfactorily mitigate or avoid the adverse impact. Such findings shall <br /> include the basis for the rejection of the potential feasible alternative for preventing the <br /> adverse impact. Such decisions may be appealed to the Planning Commission pursuant to <br /> section 18.144.020. The Planning Commission's decision shall be final and not be appealable <br /> to the City Council. <br /> D. The Building Division may approve an application subject to conditions. Any condition <br /> imposed on an application shall be designed to mitigate the specific, adverse impact upon <br /> health and safety at the lowest possible cost. <br /> E. A feasible method to satisfactorily mitigate or avoid the specific, adverse impact includes, but <br /> is not limited to, any cost-effective method, condition, or mitigation imposed by the City on <br /> another similarly situated application in a prior successful application for a permit. The City <br /> shall use its best efforts to ensure that the selected method, condition, or mitigation meets the <br /> conditions of Civil Code Section 714(d)(1)(A) and (B) defining restrictions that do not <br /> significantly increase the cost of the system or decrease its efficiency or specified <br /> performance. <br /> F. If an application is deemed incomplete, a written correction notice detailing all deficiencies in <br /> the application and any additional information or documentation required to be eligible for <br /> expedited permit issuance shall be sent to the applicant for resubmission. <br /> G. Only one inspection shall be required and performed by the Building Division for small <br /> residential rooftop solar energy systems. Once an applicant informs the Building Division that <br /> such a solar energy system has been installed, the Building Division shall complete the <br /> inspection as soon as practical (generally within 2 days) and should include consolidated <br /> inspections. <br /> H. If a small residential rooftop solar energy system fails the inspection, a subsequent inspection <br /> is authorized and a re-inspection fee may be charged. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.