My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
081815
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2015 2:34:58 PM
Creation date
8/12/2015 2:18:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/18/2015
DESTRUCT DATE
15Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vice Mayor Brown said she still objected to users who are not in financial need receiving a 20% <br /> discount simply by virtue of age. She stressed that she is very respectful of seniors on fixed incomes <br /> and simply wanted to ensure that the right people are able to benefit from the discount. <br /> Councilmember Olson reported that he and the Vice Mayor were not in agreement on that point and <br /> said he supported Councilmember Pentin's request. <br /> Mr. Fialho summarized the Council's requested modifications which include lowering the senior <br /> discount threshold to 20CCF and clarifying the process by which drought rates would be discontinued. <br /> MOTION: It was m/s by Pentin/Olson to authorize the mailing of the Proposition 218 Notice of Public <br /> Hearing regarding Water and Sewer Rates to be held on October 6, 2015, as amended. Motion passed by <br /> the following vote: <br /> AYES: Councilmembers Brown, Narum, Olson, Pentin, Mayor Thorne <br /> NOES: None <br /> ABSENT: None <br /> 24. Public Hearing: Consider a resolution approving the Recycled Water Connection Fee <br /> Ms. Wagner presented the staff report. She explained that the city's current Recycled Water Program <br /> for commercial irrigation customers includes the existing Tassajara Reservoir and its conversion from a <br /> potable to recycled water system as Phases 1a and lb of the Recycled Water Feasibility Study which <br /> creates the recycled water infrastructure on Stoneridge Drive from Johnson Drive to El Charro Road. <br /> 132 existing customers, including the sports park south of Hacienda Business Park, within the Phase 1 <br /> area are poised to take advantage of the system once it is in place. Phase 2 of the system will <br /> ultimately include a scalping plant located somewhere in the vicinity of the Pleasanton Gateway/Kohl <br /> Center on Bemal Avenue that will allow extension of the system to south Pleasanton and ultimately the <br /> golf course. Recycled water is provided by DSRSD to Johnson Drive and the City of Livermore at El <br /> Charro Road. <br /> The city contracted with HDR Engineering to develop an appropriate connection fee for the new <br /> system. Connection fees are one time charges paid by new development to finance construction of the <br /> public facilities needed to serve them and they provide the means of balancing cost requirements for <br /> new utility infrastructure between new and existing customers in order to shelter the latter from the <br /> financial impacts of growth. <br /> Ms. Wagner explained that the 132 existing customers currently being converted to the recycled system <br /> have previously paid a Potable Water Connection Fee, which covers both domestic and irrigation <br /> meters, and will have no additional connection fee. There will, however, be some minor costs <br /> associated with converting their existing systems. <br /> HDR Engineering prepared a cost based fee analysis in compliance with generally accepted methods <br /> for establishing connection fees. The methodology used is typically called a combined approach which <br /> attempts to combine the existing system with future infrastructure in order to establish a total net value <br /> of assets. This includes the Tassajara Reservoir and supply lines as well as Phases 1 and 2 which, as <br /> indicated earlier, is anticipated to cost slightly less than $19 million state loan for which the city received <br /> approval. Ms. Wagner noted that the both the benefits of the grant and cost of that loan are charged to <br /> the operating side of the recycled water system, which will be paid for by the 132 customers whose <br /> rates are proposed to be set at 90% of potable rates. <br /> The total value of the system is estimated at approximately $18 million, with half of the capacity <br /> available for new connections. This amount is then reduced by the common denominator of a 1.5 inch <br /> displacement meter for which the analysis has identified a net allowable connection fee of $74,447. <br /> City Council Minutes Page 11 of 17 July 21,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.