Laserfiche WebLink
ATTACHMENT 4 <br /> EXHIBIT A <br /> CONDITIONS OF APPROVAL <br /> P15-0037, Kursad and Zarina Kiziloglu <br /> 5196 Hummingbird Road <br /> May 27, 2015 <br /> 1. The additions shall conform substantially to the approved elevations, site plans, <br /> and other materials, Exhibit B, marked "Received January 26, 2015," on file at <br /> the Planning Division. Minor changes to the plans may be allowed subject to the <br /> approval of the Zoning Administrator if found to be in substantial conformance to <br /> the approved exhibits. <br /> 2. The second-floor balcony shall be removed from the plans submitted for a <br /> building permit. The facade of the portion of the project from which the balcony is <br /> removed shall be designed to be substantially consistent with the rest of the <br /> design of the project, including in terms of window size and spacing, siding <br /> materials and color, and other elements, and is subject to review and approval by <br /> the Director of Community Development. <br /> 3. The colors and materials of the additions shall match those of the existing <br /> structure. <br /> 4. All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment, or coordination, etc., shall be limited to the hours of <br /> 8:00 a.m. to 5:00 p.m., Monday through Saturday. No construction shall be <br /> allowed on State or Federal Holidays or Sundays. The Director of Community <br /> Development may allow earlier "start-times" or later "stop-times" for specific <br /> construction activities (e.g., concrete pouring), if it can be demonstrated to the <br /> satisfaction of the Director of Community Development that the construction <br /> noise and construction traffic noise will not affect nearby residents or <br /> businesses. All construction equipment must meet Department of Motor <br /> Vehicles (DMV) noise standards and shall be equipped with muffling <br /> devices. Prior to construction, the applicant shall post on the site the allowable <br /> hours of construction activity. <br /> 5. All appropriate City permits shall be obtained prior to the construction of the <br /> additions. <br /> 6. All conditions of approval for this case shall be reprinted and included as a plan <br /> sheet(s) with the building permit plan check sets submitted for review and <br /> approval. At all times, these conditions of approval shall be on all grading and <br /> construction plans kept on the project site. <br /> Page 1 of 2 <br />