My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
081815
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:39:21 AM
Creation date
8/11/2015 3:46:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/18/2015
DESTRUCT DATE
15Y
DOCUMENT NO
10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 - Proposal Price Comparison Summary <br /> Womack Striping Chrisp Company D&M Traffic Services* <br /> Estimate 1-Iron Horse Trail $ 2,675.00 $ 4,860.00 $ 2,474.51 <br /> Estimate 2-Willow at Gibraltar $ 4,693.25 $ 9,160.00 $ 6,112.51 <br /> Estimate 3-Boulder at Quarry $ 2,355.00 $ 7,495.00 $ 2,861.25 <br /> Total $ 9,723.25 $ 21,535.00 $ 11,448.27 <br /> rate rate rate <br /> Install 30"R1-1 on new post I Each 225 $ 225.00 385 $ 385.00 365 $ 365.00 <br /> Install 30"RI-1 on existing post 1 Each 100 <br /> $ 100.00 300 $ 300.00 125 $ 125.00 <br /> Install 36"RI-I on existing post I Each 100 <br /> $ 100.00 365 $ 365.00 140 $ 140.00 <br /> Install 36"X 48"R2-1 on existing 1 Each 150 <br /> post $ 150.00 420 $ 420.00 165 $ 165.00 <br /> Install 30"FYG W11-2 and 24"x 1 Each 275 <br /> 12"FYG W16-7P on new post <br /> $ 275.00 475 $ 475.00 340 5 340.00 <br /> Install 12"x 18"R26A on 1 Each 100 <br /> existing post $ 100.00 170 $ 170.00 115 $ 115.00 <br /> Remove 12"x 18"R26A and post I Each 225 <br /> $ 225.00 75 $ 75.00 310 $ 310.00 <br /> Remove 12"x 18"R26A and I Each 100 <br /> leave post $ 100.00 50 $ 50.00 50 $ 50.00 <br /> Install 12"x 8"R81 and 12"x 5" 1 100 <br /> R8I B on existing post $ 100.00 240 $ 240.00 125 $ 125.00 <br /> Install 30"RI-1 on existing post 1 Each 100 <br /> (sign post extension needed) <br /> $ 100.00 340 $ 340.00 185 $ 185.00 <br /> Install 30"Rl-I on street light I Each 100 <br /> pole $ 100.00 310 $ 310.00 185 $ 185.00 <br /> Install Detail 22 75 LF 1.4 $ 105.00 8 $ 600.00 1.5 $ 112.50 <br /> Install 12"white limit 15 LF 2.25 <br /> line/crosswalk line $ 33.75 30 $ 450.00 2.75 $ 41.25 <br /> Install"STOP"legend 1 Each 100 $ 100.00 300 $ 300.00 150 $ 150.00 <br /> Install"STOP AHEAD"legend 1 Each 225 <br /> $ 225.00 600 $ 600.00 300 $ 300.00 <br /> Install Detail 38 75 LF 1.4 $ 105.00 8 $ 600.00 2 $ 150.00 <br /> Install type IV arrow 1 Each 50 $ 50.00 150 $ 150.00 95 $ 95.00 <br /> Grind centerline(detail 22 or 23) 75 LF 1 <br /> $ 75.00 4 $ 300.00 2.75 $ 206.25 <br /> Grind lane line 75 LF 1 $ 75.00 3 $ 225.00 2.75 $ 206.25 <br /> Grind type IV arrow 1 Each 50 S 50.00 100 $ 100.00 95 $ 95.00 <br /> Remove sign but leave post 1 Each 75 $ 75.00 65 $ 65.00 50 $ 50.00 <br /> Remove sign post from dirt I Each 100 $ 100.00 70 $ 70.00 95 $ 95.00 <br /> Remove sign post from concrete I Each 100 <br /> $ 100.00 loo $ 100.00 190 $ 190.00 <br /> Install"25"pavement legend 1 Each 50 $ 50.00 200 $ 200.00 85 $ 85.00 <br /> Install 30"W3-3 on existing post 1 Each 100 <br /> $ 100.00 300 $ 300.00 215 $ 215.00 <br /> Total $ 2,818.75 $ 7,190.00 $ 4,096.25 <br /> Mobilization 1 EA 500 $ 500.00 job 1000 EA 1325 <br /> Traffic Control 1 EA 0 $ - day 1200 EA 1325 <br /> Cat-Tracking 1 EA 0 $ - day 2250 EA 1325 <br /> USA for new posts 1 EA 0 $ - job 550 EA 175 <br /> Night Work 1 EA 1000 $ 1,000.00 job 500 EA 1325 <br /> Total $ 1,500.00 $ 5,500.00 $ 5,475.00 <br /> *Only charged mobilization and traffic control on estimate 2,also has confusing language on traffic control being a proposal exception and I <br /> had to divide tax charged between jobs 1 and 2 equally as I am not sure what items are being taxed <br />
The URL can be used to link to this page
Your browser does not support the video tag.