Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> IV. BUILDING AND SAFETY DIVISION <br /> PLUMBING PERMIT FEES <br /> Residential Plumbing Permits <br /> Any permit for Plumbing work in a one-or two-family dwelling, or within a multi-family <br /> unit, not in conjunction with an associated Building Permit. $85.00 <br /> Non-Residential Plumbing Permits <br /> Any permit for Plumbing work in a multi-family or non-residential building not <br /> specifically itemized, or in conjunction with an associated Building Permit. $85.00 <br /> Sewer piping &vents, water piping, gas piping, fixtures and appliances or other plumbing <br /> requiring a permit not within a residential unit, each 1000 square feet of floor area. $85.00 <br /> Fats, Oil or Grease (FOG) interceptor or other pre-treatment clarifier, each $340.00 <br /> Stormwater piping or treatment systems $340.00 <br /> E. Grading Fees <br /> Plan Review Permit <br /> Less than 50 cubic yards Exempt Exempt <br /> 50 to 10,000 cubic yards <br /> first 1,000 cubic yards $194.50 <br /> each additional 1,000 cubic yards or fraction thereof 75%of Grading Permit $14.50 <br /> Fee, <br /> 10,001 cubic yards or more <br /> 1-hour min. <br /> first 10,000 cubic yards $325.00 <br /> each additional 1,000 cubic yards or fraction thereof $10.00 <br /> F. Other Fees <br /> ADMINISTRATIVE CHARGE FOR MISCELLANEOUS REQUESTS: Time & Material <br /> Administrative costs associated with items not otherwise specified, reports and Basis, <br /> requests not covered by permit or plan review fees. $20 Minimum <br /> MISCELLANEOUS BUILDING Inspections outside normal business hours 2-hr minimum <br /> INSPECTIONS" Reinspection 2-hr minimum <br /> Inspections for which no fee is specifically indicated <br /> 2-hr minimum <br /> • Housing Inspections, requested by home owner 1-hr minimum <br /> Temp Occupancy Inspection (up to 30 days max) _ 4-hr minimum <br /> "All Hourly Inspection Rates are based on fully burdened building inspector rate or <br /> consultant cost,whichever is greater. <br /> WASTE MANAGEMENT PLAN FEE <br /> Nonrefundable fee to administer and implement the WMP review and verification on <br /> covered projects not otherwise subject to California Green Building Standards. $150.00 <br /> ALTERNATE MEANS & METHODS REQUEST FEE Time& Material <br /> Plan review requests for alternate means and methods 1-hr min <br /> INVESTIGATION FEE <br /> Applicable to any work commenced on a building, structure, electrical, gas, <br /> mechanical or plumbing system before obtaining the necessary permits and approvals, 100%of Building <br /> in addition to the required permit fees. Permit Fee <br /> TECHNOLOGY FEE <br /> For permitting software licensing, IVR licensing, archiving and additional technology 5% of total permit <br /> costs associated with providing permitting and inspection services. fees <br /> GIS MAPPING FEE <br /> New developed sites, per square foot $0.002 <br /> All City of Pleasanton Building Division Fees shall be revised annually on January 1 by the percentage <br /> increase or decrease in the Engineering News Record Construction Cost Index(CCI)for the San Francisco <br /> Bay Area,and reviewed every two years. <br /> 6/16/2015 IV. Building: 8 of 15 <br />