Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> III.ENGINEERING DIVISION <br /> Tract Joint Trench Plan Check $500.00 <br /> Traffic Study Review $650.00 <br /> Amended Maps Base fee $140.00 <br /> plus fee per course correction $30.00 <br /> Lot Line Adjustment Base fee $1,330.00 <br /> plus fee per lot $40.00 <br /> Revised Erosion Hillside Base Fee $5,000.00 <br /> Control(SWPPP) plus fee per acre (disturbed area) $180.00 <br /> Flatland Base Fee $3,200.00 <br /> plus fee per acre (disturbed area) $135.00 <br /> Professional Consultant Expense Consultant cost <br /> +25% <br /> Subdivision Grading & up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Plan Section F <br /> Check ' each additional 1,000 cubic yard after 100,000 $6.50 <br /> D. Construction Services Inspection. <br /> (due 15 days prior to City Council approval of a final map or City Engineer approval of the plans, whichever <br /> occurs first) <br /> Subdivision Grading & Up to 100,000 cubic yards see Chapter IV <br /> Erosion Control Section F <br /> Inspection each additional 1,000 cubic yards over 100,000 $10.00 <br /> Construction Inspection <br /> City-inspected improvements: Base Fee Plus <br /> Valuation under$5,000 7.2% of valuation <br /> Valuation $5,000-$20,000 $360 2.76% of valuation > $5,000 <br /> Valuation over$20,000 $774 5% of valuation > $20,000 <br /> Specialized Inspections Consultant cost <br /> +25% <br /> Overtime Inspection <br /> (2 hour minimum charge) Cost+ Overhead <br /> E. Assessment Districts <br /> City Engineering Department Administration <br /> (during formation, design, and construction) Cost+ Overhead <br /> Inspection See Construction <br /> (Minimum charge is 4%of costs to construct public improvements) Inspec. Fee Table <br /> Segregation Administration <br /> Fee per district $500.00 <br /> 6/16/2015 III. Engineering: 4 of 15 <br />