Laserfiche WebLink
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. LIVERMORE PLEASANTON FIRE DEPARTMENT <br /> Hot-Works Oper: 2,251-10k cu ft $240.00 <br /> Hot-Works Oper: 10k- 100k cu ft $320.00 <br /> Hot-Works Oper: 100k-200k cu ft $400.00 <br /> Hot-Works Oper: 200k+ cu ft $480.00 <br /> Liq Petroleum Gas: <226 gal $110.00 <br /> Liq Petroleum Gas: 226-500 gal $130.00 <br /> Liq Petroleum Gas: 501-2k gal $160.00 <br /> Liq Petroleum Gas: 2k-4k gal $220.00 <br /> Liq Petroleum Gas: 4-6k gal $270.00 <br /> Liq Petroleum Gas: 6+ k gal $330.00 <br /> Liq/Gas Vehicles in Assembly $190.00 <br /> Lumber Yard or Woodworking Plant $620.00 <br /> Magnesium $300.00 <br /> Mall, covered $1,410.00 <br /> Motor Vehicle Fuel Disp Station- no bulk $180.00 <br /> Ovens, Industrial $80.00 <br /> POA: A-2 $30.00 <br /> POA: A-1 $50.00 <br /> POA: A-3 $60.00 <br /> POA: A-4 $80.00 <br /> POA: A-5 $110.00 <br /> Pyrotech Spcl Effects Material $580.00 <br /> Refrigeration Equipment $150.00 <br /> Repair Garages $340.00 <br /> Rooftop Heliport $110.00 <br /> Spraying or Dipping $80.00 <br /> Tires - Rebuilding Plant $100.00 <br /> Tire - Storage of Scrap $100.00 <br /> UST- 1 tanks $530.00 <br /> UST- 2 tanks $790.00 <br /> UST- 3 tanks $1,310.00 <br /> UST-4 tanks $1,580.00 <br /> UST- 5 tanks $1,840.00 <br /> UST-6 tanks $2,100.00 <br /> Waste Handling $130.00 <br /> Wood Products $110.00 <br /> C. Plan Review and Inspection Fees <br /> Fire Sprinkler System Fees - New Construction: <br /> up to 20 Appliances $690.00 <br /> 21 - 100 Appliances $870.00 <br /> VI. Fire 12 of 15 <br />