My WebLink
|
Help
|
About
|
Sign Out
ORD 2121
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
7/24/2015 12:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
7/21/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2121
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. Gather all sorted construction debris on a regular basis and place them <br /> in the appropriate container for recycling to be emptied at least on a <br /> weekly basis. When appropriate, use tarps on the ground to collect <br /> fallen debris or splatters that could contribute to stormwater runoff <br /> pollution. <br /> iv. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br /> pavement and storm drains adjoining the site. Limit construction access <br /> routes onto the site and place gravel on them. Do not drive vehicles and <br /> equipment off paved or graveled areas during wet weather. Broom <br /> sweep the street pavement adjoining the project site on a daily basis. <br /> Scrape caked on mud and dirt from these areas before sweeping. <br /> v. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br /> drain inlet nearest the downstream side of the project site in order to <br /> retain any debris or dirt flowing in the storm drain system. Maintain <br /> and/or replace filter materials to ensure effectiveness and to prevent <br /> street flooding. <br /> vi. Create a contained and covered area on the site for the storage of <br /> cement, paints, oils, fertilizers, pesticides, or other materials used on the <br /> site that have the potential of being discharged into the storm drain <br /> system by being windblown or in the event of a material spill. <br /> vii. Never clean machinery, equipment, tools, brushes, or rinse containers <br /> into a street, gutter, or storm drain. <br /> viii. Ensure that concrete/gunite supply trucks or concrete/plaster operations <br /> do not discharge wash water into a street, gutter, or storm drain. <br /> ix. Equipment fueling area: use a designated area away from the storm <br /> drainage facility; use secondary containment and spill rags when fueling; <br /> discourage "topping off' of fuel tanks; place a stockpile of absorbent <br /> material where it will be readily accessible; check vehicles and <br /> equipment regularly for leaking oils and fuels; and dispose rags and <br /> absorbent materials promptly and properly. Use of an off-site fueling <br /> station is strongly encouraged. <br /> x. Concrete wash area: 1) locate wash out area away from storm drains and <br /> open ditches; 2) construct a temporary pit large enough to store the <br /> liquid and solid waste; 3) clean the pit by allowing concrete to set; 4) <br /> break up the concrete; and then 5) recycle or dispose of properly. <br /> xi. Equipment and vehicle maintenance area: use a designated area away <br /> from the storm drainage facility; always use secondary containment and <br /> keep stockpile of cleanup materials nearby; regularly inspect vehicles <br /> 26 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.