My WebLink
|
Help
|
About
|
Sign Out
ORD 2121
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
7/24/2015 12:28:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
7/21/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2121
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
100. The encroachment permit for haul route for all materials and equipment to and <br /> from this development shall be approved by the City Engineer prior to the issuance <br /> of any permit by City Building Division or Engineering Division. <br /> 101. Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer. This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer. <br /> 102. The project developer shall deposit a bond with the City's Engineering Division to <br /> ensure completion of any required improvements, if any. This bond shall be in a <br /> standard form approved by the City Attorney and shall be in an amount satisfactory <br /> to the City Engineer. <br /> 103. The improvement plans for this development shall contain signage and striping <br /> plans that are subject to the approval of the City Traffic Engineer. <br /> Livermore-Pleasanton Fire Department <br /> 104. All commercial and multi-family residential occupancies shall have valve tamper <br /> and water flow connected to an Underwriters Laboratory (UL) listed Central Station <br /> Service. Fire Department plan check includes specifications, monitoring <br /> certificate(s), installation certificate and alarm company UL certificate. <br /> 105. Fire alarm control panel and remote annunciation shall be at location(s) approved <br /> by the Fire Prevention Bureau. All systems shall be point identified by individual <br /> device and annunciated by device type and point. <br /> 106. The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 107. Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major <br /> fire. <br /> 108. All fire sprinkler system water flow and control valves shall be complete and <br /> serviceable prior to final inspection. Prior to the occupancy of a building having a <br /> fire alarm system, the Fire Department shall test and witness the operation of the <br /> fire alarm system. <br /> 109. Should any operation or business activity involve the use, storage or handling of <br /> hazardous materials, the firm shall be responsible for contacting the LPFD prior to <br /> commencing operations. Please contact the Hazardous Materials Coordinator at <br /> (925) 454-2361. <br /> 17 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.