Laserfiche WebLink
to offset this project's reasonably related effect on the long-term need for <br /> expanded school facilities. The method and manner of providing these funds and/ <br /> or facilities to PUSD by applicant shall be approved by PUSD and in place prior to <br /> building permit issuance. Written proof of compliance with this condition shall be <br /> provided by applicant to the City, on a form generated by PUSD, prior to building <br /> permit issuance. <br /> 67. Prior to building permit submittal, a list of the green building measures used in the <br /> design of the units covered by this approval shall be provided to the Planning <br /> Division for the review and approval by the Director of Community Development. <br /> The green building measures shall be shown on one of the first two pages of the <br /> plans submitted for issuance of a building permit. Each point identified shall have <br /> a notation indicating the sheet the point can be found, and each sheet shall note <br /> where the point is located. All proposed green building measures shall be shown <br /> throughout the plan set, as appropriate, as determined by the Director of <br /> Community Development. <br /> A special inspection by from the Planning Division shall be coordinated with <br /> regards to landscaping, irrigation, and exterior materials. All of the green building <br /> measures indicated on the approved checklist shall be inspected and approved by <br /> either the City of Pleasanton, a third party rater, or the applicant/developer shall <br /> provide written verification by the project engineer, architect, landscape architect, <br /> or designer. <br /> 68. All HVAC condensing units shall be shown on the plans and shall be subject to the <br /> review and approval of the Director of Community Development prior to building <br /> permit issuance. <br /> 69. Only gas fireplaces, pellet fueled wood heaters or EPA certified wood-burning <br /> appliances may be installed inside or outside of the structures. <br /> 70. All conditions of approval shall be attached to all building permit plan check sets <br /> submitted for review and approval, whether stapled to the plans or located on a <br /> separate plan sheet. These conditions of approval shall be attached at all times to <br /> any grading and construction plans kept on the project site. It is the responsibility <br /> of the applicant/developer to ensure that the project contractor is aware of, and <br /> abides by, all conditions of approval. It is the responsibility of the <br /> applicant/developer to ensure that the project landscape contractor is aware of, <br /> and adheres to, the approved landscape and irrigation plans, and all conditions of <br /> approval. Prior approval from the Planning Division is required before any changes <br /> are constituted in site design, grading, building design, building colors or materials, <br /> green building measures, landscape material, etc. <br /> 71. Before project final, all landscaping shall be installed and reviewed and approved <br /> by the Planning Division. <br /> 12 of 28 <br />