Laserfiche WebLink
Table of Contents <br />1 Introduction <br />1.1 Introduction 1 <br />1.2 Organization of Report 2 <br />1.3 Disclaimer 2 <br />2 Overview of Connection Fees <br />2.1 Introduction 3 <br />2.2 Defining Connection Fees 3 <br />2.3 Economic Theory and Connection Fees 3 <br />2.4 Connection Fee Criteria 4 <br />2.5 Overview of the Connection Fee Methodology 5 <br />2.6 Summary 7 <br />3 Legal Considerations in Establishing CFs for the City <br />3.1 Introduction 8 <br />3.2 Requirements Under California Law 8 <br />3.3 Proposition 218 and Connection Fees 9 <br />3.4 Summary 10 <br />4 Determination of the City's Recycled Water Connection Fees <br />4.1 Introduction 12 <br />4.2 Overview of the City's Recycled Water System 12 <br />4.3 Calculation of the City's Connection Fee 13 <br />4.3.1 System Planning Criteria 13 <br />4.3.2 Calculation of the Recycled Water Connection Fee 14 <br />4.4 Allowable Recycled Water Connection Fee 17 <br />4.5 Key Assumptions 18 <br />4.6 Implementation of the Recycled Water Connection Fee 19 <br />4.7 Consultant Recommendations 19 <br />4.8 Summary 19 <br />Technical Appendix <br />FOIR <br />Table of Contents <br />City of Pleasanton - Recycled Water Connection Fee <br />i <br />