Laserfiche WebLink
HDR, in its calculation of the connection fee has used "generally accepted" engineering <br />and ratemaking principles. Based on their review and analysis of the City's recycled <br />water system, it is recommended: <br />✓ The City adopt the recycled water connection fees for new connections to the <br />recycled water system as proposed and annually starting January 1, 2017, adjust <br />these charges by the change in the Engineering News Record (ENR) <br />Construction Cost Index. <br />✓ The City update the actual calculations for the connection fee at such time when <br />a new capital improvement plan, facilities plan, comprehensive system plan, or a <br />comparable plan is approved or updated by the City, or every five years, or when <br />a major infrastructure project is completed. <br />Jointly Submitted by: <br />r± "re' <br />Emily Wagner <br />Special Projects <br />City Manager's Office <br />Fiscal Review: <br />PitTina Olson <br />Director of Finance <br />Daniel Smith <br />Director of Operations Services <br />Approved by: <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1) City of Pleasanton Recycled Water Connection Fee Study <br />2) Resolution Adopting the Recycled Water Connection Fee <br />Page 4 of 4 <br />