Laserfiche WebLink
development issues, these things would not escalate the way that they do. From staffs perspective, it is <br />an incredible bookkeeping exercise that would be difficult to implement efficiently. She stressed that <br />there will be an opportunity to reevaluate these fees every 2 years and at some point that might be a <br />more viable point of consideration. <br />Councilmember Olson added that time and materials based fees make it much more difficult for <br />developers to effectively pro forma a project. <br />Councilmember Narum asked if staff is proposing a change to the cost of appeals. <br />Ms. Wagner confirmed, stating that as proposed the fee would increase from $12.50 to $250. <br />Ms. Wagner continued her presentation, stating that the total cost of Engineering services in FY 2014- <br />15 was approximately $4.9 million of which only a little less than $1 million was fee related activity. <br />Additional indirect costs, mainly attributed to the city's Capital Improvement Program, increase the <br />recovery target to $1.3 million. This division currently recovers 22% in fee related charges as compared <br />to most cities who use time and materials based fees to achieve full cost recovery. Staff is proposing <br />increases that would achieve a recovery rate of 43 %. She explained that this is a conservative estimate <br />because engineering and public works inspection fees are paid at the time a permit is pulled, which is <br />sometimes up to 18 months in advance of when those services are provided so there is not always <br />direct connection between fees generated and service costs within the same fiscal year. She also noted <br />that the Finance Committee requested that some fees be increased over what was originally <br />recommended by staff in an attempt to increase cost recovery. Pleasanton currently has no fee for <br />onsite improvements for private development. This was an oversight when the fees were last amended <br />in the 1980s and it has never been corrected. Based on a $1 million improvement project, the city's <br />current plan check fees would increase from 2% ($20,000) to 3% ($30,000). Livermore current charges <br />approximately $40,000 for a similarly sized project. Construction inspection fees for the same sized <br />project would increase from 4% to 5 %. A similar project in Livermore would cost about $77,000. <br />The total cost of Building and Safety fee related services, including indirect costs and fees, totaled just <br />under $5 million in FY 2014 -15. As already mentioned, staff is proposing full cost recovery. As fees are <br />based on the cost valuation of a project, new construction valuation tables would be annually adjusted <br />using the CCI to stay abreast of changes in construction pricing. However, new construction only <br />represents about 18% of the permits issued today versus the 25% when the study was prepared. All <br />other permits for additions and renovations are based on the applicant's valuation, despite the <br />interpretive value of that valuation and the fact that some projects require the same number of site visits <br />regardless of the stated value. Staff is therefore proposing to increase the minimum fee from $23.50 to <br />$85 and to implement a flat fee for 4 types of permits impacting homeowners: kitchen remodels, <br />bathroom remodels, reroofing and swimming pools. Electrical, plumbing and mechanical permit <br />surcharges would be based on a percentage of the building permit fee as opposed to the current <br />method of counting actual fixtures. Staff is also proposing the implementation of new technology fee <br />which will help to maintain and upgrade the permit center computer hardware and software. Under the <br />proposed fee increases, building and safety fees on a new 2,000 square foot house would increase <br />from approximately $5,251 to $6,042. The 5 -city fee average is $6,426. Fees for a new 12,389 square <br />foot retail store would increase from $12,389 to $12,788, versus a 5-city fee average of $12,898. <br />Reroofing fees for a $9,000 new roof would increase from $167 to a flat fee of $210. The 5 -city fee <br />average is $241. <br />Ms. Wagner noted that General Fund budget, which the Council will be reviewing in June as part of the <br />2 -year Operating Budget, does not include these fees which are estimated to total approximately $2.7 <br />million. Staff and the Finance Committee are recommending that the City Council implement the <br />proposed fee increases in FY 2015 -16 at an overall cost recovery level of 79% as developed in the <br />City Council Agenda Page 9 of 11 April 07, 2015 <br />