My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
072115
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:44:38 AM
Creation date
7/14/2015 3:44:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/21/2015
DESTRUCT DATE
15Y
DOCUMENT NO
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Manager Weinstein presented the staff report, which relates to a series of application for a site <br />located at 5850 West Las Positas Boulevard that would allow for the construction of a 94 -unit <br />residential ownership project. The roughly 6 acre site located in Hacienda Business Park is occupied by <br />a currently vacant one -story building bordered by office uses to the east and west, Las Positas <br />Boulevard to the north and the Arroyo Mocho to the south. Beyond the Arroyo is the Parkside <br />neighborhood. <br />In January 2012 the City Council approved the rezoning of 9 sites throughout the city for higher density <br />multi - family residential development to meet the city's Regional Housing Needs Assessment (RHNA) <br />obligations. This site, together with the adjacent 6.7 acre CM Capital 2 site to the west, was one of the <br />9 rezoned sites. The rezoning was followed by the adoption of a set of Housing Site Development <br />Standards to ensure that higher density projects on the 9 sites would be well designed. In March 2014 <br />the Council then approved a 177 -unit apartment project for the subject site. One year later the <br />developer has submitted a new development application for a less dense 94 -unit project. The Housing <br />and Planning Commissions reviewed the project in April and May of this year and unanimously <br />recommended approval of the project. <br />Key components of the project include: 1) rezoning the site from 30 units to 15.9 units per acre, which <br />would also need to be reflected in the Housing Site Development Standards; 2) the physical <br />development plan for the project, comprising the 94 condominium units including 10 affordable housing <br />units, open space, and 246 garage and surface parking spaces; 3) an amendment to the Development <br />Agreement to reflect the current proposal; and 4) the Affordable Housing Agreement which requires the <br />project sponsor to construct 10 affordable units on the site and pay approximately $122,000 to the city's <br />Affordable Housing Fund. Combined, the affordable units and fee would fulfill the intent of the <br />Inclusionary Zoning Ordinance. <br />Mr. Weinstein reviewed the exceptions to the Housing Site Development Standards that are being <br />requested by the applicant. The first relates to a slightly reduced setback from the sidewalk for buildings <br />9 and 16. While the proposed setback of no less than 4.5 feet from the back end of the sidewalk would <br />allow for adequate building separation, it does not fully achieve the 8 -foot setback requirement. The <br />second relates to building 12, which would not meet the requirement that 75% of its street facing side <br />be fronted with livable space. Staff supports this exception because this is the only 2 -story 2 -unit <br />building in the project and all others would meet the requirement. The applicant has also requested an <br />exception to the guideline requiring a 25 to 30 -foot building separation for buildings 4 through 7. These <br />buildings have both recessed and projected facades that result in a separation of only 21 feet where <br />there are projected facades. Staff supports the exception because these areas are on the upper levels <br />and face a very spacious central paseo that compensates for the reduced separation. Finally, the <br />applicant has requested the elimination of planter strips in a very small portion of the project site <br />adjacent to buildings 16 and 9. Again, staff finds this a generally acceptable tradeoff to help maximize <br />the size of open space on the project site. <br />He reviewed several slides depicting the project's site and circulation plans, noting that the 2 -story <br />structures are located on the southem and westem boundaries of the project site and are proposed to <br />step down towards adjacent development. The project architecture is loosely Spanish in style and <br />characterized by features such as wrought iron railings, stone trim and tile roofs. Staff supports the <br />building design but has recommended several refinements in the conditions of approval, including <br />making the building bases and doorways more prominent. The project's proposed landscaping plan is <br />generally appropriate although again staff has added conditions of approval requiring that a portion of <br />the proposed tree plantings be exchanged for those that are more water efficient and can <br />accommodate the high salt content of recycled water that will ultimately serve the site. Staff has also <br />recommended a condition of approval requiring an updated tree report to reexamine which trees would <br />be preserved or removed in light of the amended site plan. <br />City Council Minutes <br />Page 10 of 18 June 16, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.