Laserfiche WebLink
14. Campers, trailers, motor homes, or any other similar vehicle are not allowed on the <br /> construction site except when needed as sleeping quarters for a security guard. <br /> 15. A construction trailer shall be allowed to be placed on the project site for daily <br /> administration/coordination purposes during the construction period. <br /> 16. Portable toilets used during construction shall be kept as far as possible from <br /> existing residences and shall be emptied on a regular basis as necessary to <br /> prevent odor. <br /> 17. The applicant and future homeowner are encouraged to use reclaimed gray water, <br /> rain water, etc., for landscape irrigation. If used, the details shall be shown on the <br /> permit plan set to the satisfaction of the Director of Community Development <br /> before issuance of a building permit. <br /> 18. All fireplaces shall be a gas fireplace, pellet fueled wood heater, or EPA certified <br /> wood-burning appliance. The fireplace type shall be indicated on the floor plan <br /> and/or specification sheet(s) submitted for issuance of building permits. <br /> SPECIAL CONDITIONS OF APPROVAL <br /> Planning <br /> 19. The residence shall be constructed to allow for the future installation of a <br /> photovoltaic system and a solar-water-heating system. The applicant or building <br /> developer shall comply with the following requirements to make the residence <br /> photovoltaic- and solar-water-heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an <br /> "inverter' required to convert the direct current output from the photovoltaic <br /> panels to alternating current, <br /> c. Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a photovoltaic <br /> and solar water heating system beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. `Space shall be provided for a solar-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of <br /> the first building permit. <br /> Page 3 <br />