My WebLink
|
Help
|
About
|
Sign Out
RES 15760
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15760
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:05:29 AM
Creation date
7/2/2015 3:03:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2015
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. Campers, trailers, motor homes, or any other similar vehicle are not allowed on the <br /> construction site except when needed as sleeping quarters for a security guard. <br /> 15. A construction trailer shall be allowed to be placed on the project site for daily <br /> administration/coordination purposes during the construction period. <br /> 16. Portable toilets used during construction shall be kept as far as possible from <br /> existing residences and shall be emptied on a regular basis as necessary to <br /> prevent odor. <br /> 17. The applicant and future homeowner are encouraged to use reclaimed gray water, <br /> rain water, etc., for landscape irrigation. If used, the details shall be shown on the <br /> permit plan set to the satisfaction of the Director of Community Development <br /> before issuance of a building permit. <br /> 18. All fireplaces shall be a gas fireplace, pellet fueled wood heater, or EPA certified <br /> wood-burning appliance. The fireplace type shall be indicated on the floor plan <br /> and/or specification sheet(s) submitted for issuance of building permits. <br /> SPECIAL CONDITIONS OF APPROVAL <br /> Planning <br /> 19. The residence shall be constructed to allow for the future installation of a <br /> photovoltaic system and a solar-water-heating system. The applicant or building <br /> developer shall comply with the following requirements to make the residence <br /> photovoltaic- and solar-water-heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an <br /> "inverter' required to convert the direct current output from the photovoltaic <br /> panels to alternating current, <br /> c. Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a photovoltaic <br /> and solar water heating system beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. `Space shall be provided for a solar-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of <br /> the first building permit. <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.