My WebLink
|
Help
|
About
|
Sign Out
RES 15757
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:05:29 AM
Creation date
7/2/2015 3:02:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2015
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MC Development Fee Schedule <br /> FY 2014/2015 Fee Per Unit <br /> Single Family Homes $2,433 Du' <br /> Multi-Family Homes $1,549 Du' <br /> Retail $1,620 1,000sf <br /> Office $4,370 1,000sf <br /> Industrial $2,950• 1,000sf <br /> Other $2,433 MIT** <br /> Affordable Housing $0 Du* <br /> FY 2015/2016 Fee Per Unit <br /> Single Family Homes $3,060 Du' <br /> Multi-Family Homes $2,108 Du` <br /> Retail"' $3,410 1,000sf <br /> Office $5,200 1,000sf <br /> Industrial $3,030 1,000sf <br /> Other $3,400 PHT" <br /> Affordable Housing $0 Du* <br /> FY 201612017 to FY 2029/2030 Fee Per Unit <br /> Single Family Homes $4,283 Du' <br /> Multi-Family Homes $2,951 Du' <br /> Retail*" $3,410 1,000sf <br /> Office $7,280 1,000sf <br /> Industrial $4,240 1,000sf <br /> Other $4,759 PHT"' <br /> Affordable Housing $0 Du* <br /> *Du— Dwelling Unit <br /> "PHT— Peak Hour Trip <br /> Retail set at 15% of maximum for FY2014/15 to FY 2029/30 <br /> SECTION 4— Exemptions From TVTD Fee <br /> The TVTD fee shall not be imposed on any of the following: <br /> a) Any alteration or addition to a residential structure, except to the extent that a residential <br /> unit is added to a single-family residential unit or another unit is added to an existing <br /> multifamily residential unit; <br /> b) Any replacement or reconstruction of an existing residential structure that has been <br /> destroyed or demolished; provided, that the building permit for reconstruction is obtained <br /> within one year after the building was destroyed or demolished unless the replacement <br /> or reconstruction increases the square footage of the structure 50 percent or more; <br /> c) Any replacement or reconstruction of an existing nonresidential structure that has been <br /> destroyed or demolished; provided, that the building permit for new reconstruction is <br /> obtained within one year after the building was destroyed or demolished and the <br /> reconstructed building would not increase the destroyed or demolished building's <br /> average peak hour trips; <br />
The URL can be used to link to this page
Your browser does not support the video tag.