My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:30 AM
Creation date
6/11/2015 12:21:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
measures, including concrete-lined V-ditches, to protect all cut and fill slopes from <br /> surface water overflow, etc., shall be submitted as part of the building permit plans. <br /> This plan shall be subject to the review and approval of the City Engineer prior to <br /> the issuance of a grading permit by Engineering Division. <br /> 91. The project developer shall include erosion control measures, prepared and signed <br /> by the Qualified Storm Water Pollution Prevention Plan Developer (QSD), on the <br /> final grading plan, subject to the review of the City Engineer. This erosion control <br /> measures shall be as required by the state's Construction General Permit. The <br /> project developer is responsible for ensuring that the contractor is aware of such <br /> measures. All cut and fill slopes shall be revegetated and stabilized as soon as <br /> possible after completion of grading, in no case later than October 15. No grading <br /> shall occur between October 15 and April 15 unless approved erosion control <br /> measures are in place, subject to the approval of the project QSD and the City <br /> Engineer. Such measures shall be maintained until such time as a permanent <br /> landscaping is in place, site is stabilized and Notice of Completion (NOC) has been <br /> filed with the State Regional Water Board and/or accepted by City. <br /> 92. There shall be no direct roof leaders connected to the street gutter or storm drain <br /> system, unless otherwise approved by the City Engineer. <br /> 93. All retaining walls along the street shall be placed behind the Public Service <br /> Easement (PSE), unless otherwise approved by the City Engineer. <br /> 94. This approval does not guarantee the availability of sufficient water and/or sewer <br /> capacity to serve the project. <br /> 95. The project developer shall submit detailed landscape and irrigation plans as part <br /> of the building permit plans. The irrigation plan shall provide for automatic <br /> controls. <br /> 96. The building permit plans for this development shall contain signage and striping <br /> plans that are subject to the approval of the City Traffic Engineer. <br /> 97. All dry utilities (electric power distribution, gas distribution, communication service, <br /> Cable television, street lights and any required alarm systems) required to serve <br /> existing or new development shall be installed in conduit, underground in a joint <br /> utility trench unless otherwise specifically approved by the City Engineer. <br /> 98. The project developer shall arrange and pay for the geotechnical consultant to <br /> inspect and approve all foundation, retaining, and wall and drainage geotechnical <br /> aspects of project construction. The consultant shall be present on site during <br /> grading and excavation operations. The results of the inspections and the as-built <br /> conditions of the project shall be certified in writing by the geotechnical consultant <br /> for conformance to the approved plans and geotechnical report and submitted to <br /> the City Engineer for review and approval prior to occupancy. <br /> 16 of 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.