My WebLink
|
Help
|
About
|
Sign Out
19
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:05 AM
Creation date
6/9/2015 4:14:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> VI. LIVERMORE PLEASANTON FIRE DEPARTMENT * <br /> Universal Waste Collection Site $570.00 <br /> High-Piled Combust Storage $280.00 <br /> Hot-Works Oper: <551 cu ft $160.00 <br /> Hot-Works Oper: 551 - 2,250 cu ft $190.00 <br /> Hot-Works Oper: 2,251-10k cu ft $240.00 <br /> Hot-Works Oper: 10k- 100k cu ft $320.00 <br /> Hot-Works Oper. 100k-200k cu ft $400.00 <br /> Hot-Works Oper. 200k+ cu ft $480.00 <br /> Liq Petroleum Gas: <226 gal $110.00 <br /> Liq Petroleum Gas: 226-500 gal $130.00 <br /> Liq Petroleum Gas: 501-2k gal $160.00 <br /> Liq Petroleum Gas: 2k-4k gal $220.00 <br /> Liq Petroleum Gas: 4-6k gal $270.00 <br /> Liq Petroleum Gas: 6+ k gal $330.00 <br /> Liq/Gas Vehicles in Assembly $190.00 <br /> Lumber Yard or Woodworking Plant $620.00 <br /> Magnesium $300.00 <br /> Mall, covered $1,410.00 <br /> Motor Vehicle Fuel Disp Station- no bulk $180.00 <br /> Ovens, Industrial $80.00 <br /> POA: A-2 $30.00 <br /> POA: A-1 $50.00 <br /> POA: A-3 $60.00 <br /> POA: A-4 $80.00 <br /> POA: A-5 $110.00 <br /> Pyrotech Spcl Effects Material $580.00 <br /> Refrigeration Equipment $150.00 <br /> Repair Garages $340.00 <br /> Rooftop Heliport $110.00 <br /> Spraying or Dipping $80.00 <br /> Tires - Rebuilding Plant $100.00 <br /> Tire -Storage of Scrap $100.00 <br /> UST- 1 tanks $530.00 <br /> UST-2 tanks $790.00 <br /> UST-3 tanks $1,310.00 <br /> UST-4 tanks $1,580.00 <br /> UST- 5 tanks $1,840.00 <br /> UST- 6 tanks $2,100.00 <br /> Waste Handling $130.00 <br /> VI. Fire 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.