My WebLink
|
Help
|
About
|
Sign Out
19
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:53:05 AM
Creation date
6/9/2015 4:14:00 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
19
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF PLEASANTON <br /> MASTER FEE SCHEDULE <br /> IV. BUILDING AND SAFETY DIVISION * <br /> F. Other Fees <br /> ADMINISTRATIVE CHARGE FOR MISCELLANEOUS REQUESTS: Time& Material <br /> Administrative costs associated with items not otherwise specified, reports and Basis, <br /> requests not covered by permit or plan review fees. $20 Minimum <br /> MISCELLANEOUS BUILDING Inspections outside normal business hours 2-hr minimum <br /> INSPECTIONS** Reinspection 2-hr minimum <br /> Inspections for which no fee is specifically indicated <br /> 2-hr minimum <br /> Housing Inspections, requested by home owner 1-hr minimum <br /> Temp Occupancy Inspection (up to 30 days max) 4-hr minimum <br /> **All Hourly Inspection Rates are based on fully burdened building inspector rate or <br /> consultant cost,whichever is greater. <br /> WASTE MANAGEMENT PLAN FEE <br /> Nonrefundable fee to administer and implement the WMP review and verification on <br /> covered projects not otherwise subject to California Green Building Standards. $150.00 <br /> ALTERNATE MEANS& METHODS REQUEST FEE Time&Material <br /> Plan review requests for alternate means and methods 1-hr min <br /> INVESTIGATION FEE <br /> Applicable to any work commenced on a building, structure, electrical, gas, <br /> mechanical or plumbing system before obtaining the necessary permits and approvals, 100%of Building <br /> in addition to the required permit fees. Permit Fee <br /> TECHNOLOGY FEE <br /> For permitting software licensing, IVR licensing, archiving and additional technology 5%of total permit <br /> costs associated with providing permitting and inspection services. <br /> fees <br /> GIS MAPPING FEE <br /> New developed sites, per square foot $0.002 <br /> * Beginning 1 January 2017 all City of Pleasanton Building fees are subject to an annual inflation adjustment <br /> based upon the latest available monthly Engineering News Record Construction Cost Index(CCI) for the San <br /> Francisco Bay Area as of December of the previous year. The base index period for inflation adjustment will be <br /> the December 2015 CCI. In addition, the fees will be reviewed every 2 years. <br /> STATE OF CALIFORNIA FEES (set by State and not subject to annual CCI adjustment) <br /> Strong Motion Instrumentation Residential, per$1,000 construction valuation $0.13 <br /> Program (SMIP) ($.50 min) <br /> Non Residential, per$1,000 construction valuation $0.28 <br /> ($.50 min) <br /> Building Standards Special Revolving per$25,000 valuation or fraction thereof $1.00 <br /> 'Fund <br /> 6/10/2015 IV. Building: 9 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.