Laserfiche WebLink
' SCOPE OF SERVICES <br /> STREETS—Concrete and Sound Wall Re air <br /> },Contractor Name Prectston Concrete (.utttng f "Stgnature '''..1-7/ j%, ���� ?. ` <br /> o i <br /> �_�_:=. {{r.`.. _...._.. . _._.. L'�s?4 A �� "..._, :1b ,::i!',..4[4,4;m iv:.a.,2,...,."., ..°.�.e , e .1.j:g1 d,.-5 ," ,y v ®; .0 1 s i 7.+ �i� <br /> M N / <br /> The following outline provides a scope of work for the City's expectations regarding routine and <br /> scheduled sidewalk, curb and gutter, miscellaneous sound wall repairs and resetting of brick <br /> paving stones on City right of ways. <br /> • Removal and replacement of sidewalk per square foot to include root cutting or grinding, <br /> if necessary. <br /> • Removal and replacement of curb and gutter per linear foot, to include root cutting or <br /> grinding, if necessary. <br /> • Removal and replacement of driveway approach per square foot, to include root cutting <br /> or grinding, if necessary. <br /> • Removal of existing concrete and installation of handicap ramps per City specifications. <br /> • Rebuild-reconstruct damaged cinderblock sound wall per square foot per City <br /> specifications. <br /> • Resetting of brick paving stones per square foot per City specifications. <br /> • Contractor will perform all concrete and asphalt cutting, removing and replacement per <br /> City specifications. <br /> Scope of Work Price Unit <br /> Removal and replacement of sidewalk per square foot, including root $ Square foot <br /> cutting or grinding if necessary,less than 160 sq.ft. <br /> Removal and replacement of sidewalk per square foot, including root $ Square foot <br /> cutting or grinding if necessary,more than 160 sq. ft. <br /> Removal and replacement of curb and gutter per linear foot, to include $ Linear foot <br /> root cutting or grinding if necessary,less than 40'. <br /> Removal and replacement of curb and gutter per linear foot, to include $ Linear foot <br /> root cutting or grinding if necessary,more than 40' <br /> Removal and replacement of driveway approach per square foot, to <br /> include root cutting or grinding if necessary, for one driveway 19'-23' $ Square foot <br /> wide. <br /> Removal of existing concrete and installation of Case A handicap ramp $ Each <br /> for one ramp. <br /> Removal of existing concrete and installation of Case A handicap ramp $ Each <br /> for 10 ramps <br /> Rebuilt/construct sections of damaged cinderblock sound wall, per City $ Square foot <br /> specifications,at 100 sq. ft.per panel. <br /> Resetting of brick pavers per City specifications, 100 sq. ft. $ Square foot <br /> Saw-cutting of uneven sidewalk panels resulting in the creation of $ 32 95 Inch-foot(see <br /> a miniature ADA compliant ramp . attachment#2) <br /> Percent of mark-up on material: n/a % Percent Mark-up on invoicing must be demonstrated <br /> as a percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: n/a % (equipment pre-approved by the City). <br /> Mark-up on invoicing must be demonstrated as a percentage. Example: Outside Equipment <br /> $2,000 + 10% ($200) = $2,200 <br /> Billing of hours of work will be by n/a 1/4 Hr. n/a 1/2 Hr.n/a 1 Hr. Increments (Select one) <br /> pL EASANTON. <br />