Laserfiche WebLink
SCOPE OF SERVICES <br /> UTILITIES-Polvbutvlene Service Replacement <br /> Contractor Name: Ponte General Engineering Corp Signature: . <br /> • Contractor will repair and/or replace Polybutylene water service laterals "as required" on a scheduled and 24-hour emergency basis <br /> including overtime if required according to prescribed specifications and City of Pleasanton Standard Details. <br /> • Contractor shall diligently perform the services and furnish the personnel, materials, equipment, vehicles, safety devices, traffic control <br /> equipment and plans for sewer main and structure repairs and replacement work. <br /> • Contractor,after being advised by the Utilities Division on a work area,must notify residents or businesses in writing a notice to perform <br /> services for the City a minimum of 48 hours prior to work being started. Contractor must also provide a copy of the notice to the Utilities <br /> Division. <br /> • In emergency situations,the contractor must verbally notify residents and businesses prior to interruption of service. <br /> • All necessary asphalt or concrete cutting or sawing removal and replacement per City Specifications. <br /> • Submit to City of Pleasanton Utilities Division as-built drawing for each new project including address and location. <br /> • Remove and replace polybutylene services(I"through 2")with polyethylene tubing per City of Pleasanton Drawing 301 Note 4 Column <br /> A. <br /> • Repair water services on an"as required"basis and also on a 24-hour emergency basis including overtime if required. <br /> • Service replacement by"Pulling Method". <br /> CONTRACTOR'S LABOR RATES (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callout <br /> Foreperson $120.00 $180.00 $240.00 $150.00 <br /> Operator $90.00 $135.00 $180.00 $100.00 <br /> Laborer/Pipe layer $70.00 $1 05.00 $140.00 $80.00 <br /> Truck Driver $70.00 $105.00 $140.00 $80.00 <br /> Expeditor $65.00 $97.50 $130.00 $75.00 <br /> Apprentice Rate $68.00 $102.00 $136.00 $78.00 <br /> Journey Rate $75.00 $112.50 $150.00 $89.00 <br /> $ $ $ $ <br /> Contractor's Equipment <br /> Equipment Size& Description Hourly Rate <br /> Excavator Rent if need it $n/a <br /> Backhoe Loader Case 580 Super m $55.00 <br /> Truck&Tools One ton utility services truck(f450 ford) $32.00 <br /> Compressor w/Tools Compressor smith 100 $22.00 <br /> Wacker Wacker diesel $4.50 <br /> Pumps 2"and 4"pump $6.50 <br /> Arrow Board Arrow board exlipse solar $3.50 <br /> Traffic Cones 18"Cones $2.00 <br /> Barricades Banicades $45 <br /> Dump Truck Dump Truck 3axl $55.00 <br /> Concrete/Asphalt Saw Concrete saw 13hp $6.50 <br /> Misc. Tools $0 <br /> Paving Roller Dynapak 42"model cc12 $50.00 <br /> Trailer low bed 2 axle 4 tiers $14.00 <br /> Percent of mark-up on material: ' % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: '15 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment$2,000 + 10% ($200)= $2,200 <br /> Billing of hours of work will be by 1/4 Hr. X 1/2 Hr. 1 Hr. Increments (Select one) <br /> 31IPaue <br /> pLEASANTON. <br />